Journal of System Simulation ›› 2022, Vol. 34 ›› Issue (2): 201-211.doi: 10.16182/j.issn1004731x.joss.21-0372
• Invited Papers & Special Columns • Previous Articles Next Articles
Zi'an Zhao(
), Hong Zhou(
), Yingjian Lei
Received:2021-04-27
Revised:2021-08-11
Online:2022-02-18
Published:2022-02-23
Contact:
Hong Zhou
E-mail:ZY2008222@buaa.edu.cn;h_zhou@buaa.edu.cn
CLC Number:
Zi'an Zhao, Hong Zhou, Yingjian Lei. Modeling and Optimization for Manufacturing Cell Scheduling Based on Improved Wolf Pack Algorithm and Simulation[J]. Journal of System Simulation, 2022, 34(2): 201-211.
Table 4
Comparison of 5 optimization algorithms
| 算例 | GA | ACO | WPA | TWPA | WPA-BFO-SIM | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| 时间/s | 目标函数值 | 时间/s | 目标函数值 | 时间/s | 目标函数值 | 时间/s | 目标函数值 | 时间/s | 目标函数值 | |
| 1 | 2.746 | 51.5 | 2.348 | 51.5 | 1.447 | 51.5 | 1.041 | 51.5 | 0.665 | 51.5 |
| 2 | 4.272 | 95.1 | 3.363 | 95.1 | 3.623 | 95.1 | 1.847 | 95.1 | 1.164 | 95.1 |
| 3 | 5.167 | 129.2 | 4.396 | 129.2 | 4.818 | 129.2 | 3.071 | 127.4 | 2.598 | 127.4 |
| 4 | 5.824 | 173.3 | 4.527 | 173.3 | 5.157 | 170.3 | 8.626 | 171.5 | 4.735 | 170.3 |
| 5 | 15.154 | 287.2 | 14.259 | 289.5 | 11.654 | 287 | 13.966 | 277 | 9.829 | 276.7 |
| 6 | 19.496 | 436.2 | 20.692 | 437.5 | 21.556 | 469.2 | 30.182 | 418.4 | 19.410 | 401.2 |
| 7 | 35.777 | 989.7 | 66.013 | 962.8 | 28.063 | 924.4 | 39.110 | 824.8 | 26.906 | 776.4 |
| 8 | 77.822 | 1 502 | 75.199 | 1 529.1 | 78.671 | 1 579.2 | 73.521 | 1 474.8 | 76.098 | 1 378.9 |
| 9 | 113.453 | 2 335 | 130.412 | 2 440 | 96.107 | 2 390.4 | 85.419 | 2 031.7 | 77.202 | 2 020.6 |
| 10 | 215.747 | 2 977.8 | 250.231 | 3 891.1 | 269.663 | 2 951.1 | 353.439 | 2 460.1 | 204.960 | 2 301.7 |
Table 5
Optimization comparison of 5 optimization algorithms under different data scales
| 算例 | GA | ACO | WPA | HWPA | WPA-BFO-SIM | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 4.8 | 4.4 | 41.2 | 4.8 | 4.4 | 41.2 | 4.8 | 4.4 | 41.2 | 4.8 | 4.4 | 41.2 | 4.8 | 4.4 | 41.2 |
| 2 | 2.8 | 17.1 | 25 | 2.8 | 17.1 | 25 | 2.8 | 17.1 | 25 | 2.8 | 17.1 | 25 | 2.8 | 17.1 | 25 |
| 3 | 6.2 | 10.4 | 23.1 | 6.2 | 10.4 | 23.1 | 5.2 | 10.4 | 20.9 | 8 | 10.4 | 26.7 | 8 | 10.4 | 26.7 |
| 4 | 3.3 | 7.1 | 13.5 | 3.3 | 7.1 | 13.5 | 5.3 | 7.1 | 17.4 | 5.8 | 9.8 | 20.6 | 7 | 9.8 | 23 |
| 5 | 0.5 | 6.4 | 5.5 | 0.7 | 7.6 | 6.2 | 1.5 | 9.6 | 12.6 | 2 | 11.5 | 15.4 | 2.8 | 11.5 | 17 |
| 6 | 0.3 | 2 | 2.8 | 0.6 | 5.9 | 4.7 | 1 | 3.9 | 6.3 | 1.3 | 13 | 21.6 | 4.9 | 14.8 | 24.8 |
| 7 | 1.7 | 9.1 | 13.6 | 3.8 | 15.2 | 24.8 | 3.1 | 9.8 | 18.1 | 3.5 | 23.3 | 31.2 | 3.1 | 24.8 | 32.1 |
| 8 | 0.8 | 9.1 | 11.6 | 5.1 | 10.2 | 25.5 | 6.7 | 24.6 | 3 | 5.3 | 16 | 30 | 5.6 | 24.6 | 33.2 |
| 9 | 0.6 | 7 | 4.7 | 4.3 | 9.2 | 24 | 1.4 | 6.7 | 9.7 | 5 | 10.7 | 29 | 5.1 | 13.5 | 31.5 |
| 10 | 3 | 4.2 | 17.3 | 4.5 | 6.3 | 19.9 | 1.2 | 8.3 | 13.9 | 6 | 10.2 | 34.6 | 6.5 | 16.2 | 41.7 |
| 1 | Wu X, Chu C H, Wang Y, et al. A Genetic Algorithm for Cellular Manufacturing Design and Layout[J]. European Journal of Operational Research, 2007, 181:156-167. |
| 2 | Feng Y, Li G, Sethi S P S. A Three-layer Chromosome Genetic Algorithm for Multi-cell Scheduling with Flexible Routes and Machine Sharing[J]. International Journal of Production Economics, 2018, 196:269-283. |
| 3 | Sinaki R Y, Sadeghi A, Suer G, et al. A Weighted Multi-Objective Mathematical Model for Cell Scheduling and Environmentally Sustainable Supply Chain Network[J]. Procedia Manufacturing, 2019, 39:1559-1566. |
| 4 | International Energy Agency (IEA), International Energy Outlook 2017[R]. [2017-09-14](2021-03-21) https://www.eia.gov/pressroom/presentations/mead_91417. pdf. |
| 5 | Iqbal N, Aziz M H, Jahanzaib M, et al. Integration of Cell Formation and Job Sequencing to Minimize Energy Consumption with Minimum Make-span[J]. Proceedings of the Institution of Mechanical Engineers Part B Journal of Engineering Manufacture(S0954-4054), 2016, 231(14): 2636-2651. |
| 6 | Liu Y, Dong H, Lohse N, et al. A multi-objective Genetic Algorithm for Optimization of Energy Consumption and Shop Floor Production Performance[J]. International Journal of Production Economics(S0925-5273), 2016, 179: 259-272. |
| 7 | Gahm C, Denz F, Dirr M, et al. Energy-efficient Scheduling in Manufacturing Companies: A Review and Research Framework[J]. European Journal of Operational Research(S0377-2217), 2016, 248(3): 744-757. |
| 8 | Yang Y, Huang M, Wang Z Y, et al. Robust Scheduling based on Extreme Learning Machine for Bi-objective Flexible Job-shop Problems with Machine Breakdowns[J]. Expert Systems with Applications(S0957-4174), 2020, 158: 113545. |
| 9 | Tadayonirad S, Seidgar H, Fazlollahtabar H, et al. Robust Scheduling in Two-stage Assembly Flow Shop Problem with Random Machine Breakdowns: Integrated Meta-heuristic Algorithms and Simulation Approach[J]. Assembly Automation(S0144-5154), 2019, 39(5): 944-962. |
| 10 | Li Y, He Y, Wang Y, et al. An Optimization Method for Energy-conscious Production in Flexible Machining Job Shops with Dynamic Job Arrivals and Machine Breakdowns[J]. Journal of Cleaner Production(S0959-6526), 2020, 254:120009. |
| 11 | Sarker R, Omar M, Hasan K S M, et al. Hybrid Evolutionary Algorithm for Job Scheduling under Machine Maintenance[J]. Applied Soft Computing(S1568-4946), 2013, 13(3):1440-1447. |
| 12 | 吴虎胜, 张凤鸣, 吴庐山.一种新的群体智能算法—狼群算法[J].系统工程与电子技术, 2013, 35(11): 2430-2438. |
| Wu Husheng, Zhang Fengming, Wu Lushan. New Swarm Intelligence Algorithm——wolf Pack Algorithm[J]. Systems Engineering and Electronics, 2013, 35(11): 2430-2438. | |
| 13 | Wu H S, Xue J J, Xiao R B, et al. Uncertain Bilevel Knapsack Problem based on an Improved Binary Wolf Pack Algorithm[J]. Frontiers of Information Technology & Electronic Engineering(S2095-9184), 2020, 21(9): 1356-1368. |
| 14 | Xiu-Wu Y U, Hao Y U, Yong L, et al. A Clustering Routing Algorithm based on Wolf Pack Algorithm for Heterogeneous Wireless Sensor Networks[J]. Computer networks(S1389-1286), 2020, 167(Feb.11): 106994.1-106994.10. |
| 15 | Hu J, Wu H, Zhan R, et al. Hybrid Integer-coded Wolf Pack Algorithm for Multiple-Type Flatcars Loading Problem[J]. Journal of Rail Transport Planning & Management(S2210-9706), 2020: 100201. |
| 16 | Chen Y, Jia Z, Ai X, et al. A Modified Two-part Wolf Pack Search Algorithm for the Multiple Traveling Salesmen Problem[J]. Applied Soft Computing(S1568-4946), 2017, 61:714-725. |
| 17 | Chen X Y, Tang C J, Wang J, et al. Improved Wolf Pack Algorithm Based on Differential Evolution Elite Set[J]. IEICE Transactions on Information and Systems(S1745-1361), 2018, E101D (7): 1946-1949. |
| 18 | Passino K M. Biomimicry of Bacterial Foraging for Distributed Optimization and Control[J]. IEEE Control Systems Magazine(S1066-033X), 2002, 22(3): 52-67. |
| 19 | 李堂金. 基于狼群算法的模糊时间序列预测模型研究[D]. 重庆: 重庆邮电大学, 2020. |
| Li Tangjin. Research on the Fuzzy Time Series Forecasting Model Based on Wolf Pack Algorithm[D]. Chongqing: Chongqing University of Posts and Telecommunications, 2020. | |
| 20 | 郭立婷. 基于自适应和变游走方向的改进狼群算法[J].浙江大学学报(理学版), 2018, 45(3): 284-293. |
| Guo Liting. Improved Wolf Pack Algorithm based on Adaptive Step Length and Adjustable Scouting Direction[J]. Journal of Zhejiang University (Science Edition), 2018, 45(3): 284-293. | |
| 21 | Mirjalili S, Lewis A2016. The Whale Optimization Algorithm[J]. Advances in Engineering Software(S0965-9978), 95(5), 51-67. |
| 22 | 谢锐强, 张惠珍.求解柔性作业车间调度问题的两段式狼群算法[J].计算机工程与应用, 2021, 57(7): 251-256. |
| Xie Ruiqiang, Zhang Huizhen. Two-Vector Wolf Pack Algorithm for Flexible Job Shop Scheduling Problem[J]. Computer Engineering and Applications, 2021, 57(7): 251-256. |
| [1] | Li Min, Zhang Sen, Zeng Xiangguang, Wang Gang, Zhang Tongwei, Xie Dijie, Ren Wenzhe, Zhang Tao. Trajectory Planning of Quadruped Robot Over Obstacle with Single Leg Based on Deep Reinforcement Learning [J]. Journal of System Simulation, 2025, 37(4): 895-909. |
| [2] | Wen Tingxin, Guan Tingyu. Hybrid Flow Shop Scheduling with Limited Buffers Considering Energy Consumption and Transportation [J]. Journal of System Simulation, 2024, 36(6): 1344-1358. |
| [3] | Wei Sheng, Wang Yan, Ji Zhicheng. Just-in-time Learning Energy Consumption Predictive Modeling Method in Multi-condition Production Process [J]. Journal of System Simulation, 2024, 36(6): 1378-1391. |
| [4] | Jiang Changjian, Fan Hu, Luo Tao, Yuan Wen, He Zehao. Completion Time Simulation Prediction Method for Aircraft Assembly Process with Batch and Sortie [J]. Journal of System Simulation, 2024, 36(6): 1404-1413. |
| [5] | Zhao Yanlin, Tian Yunna. Hyper-heuristic Approach with K-means Clustering for Inter-cell Scheduling [J]. Journal of System Simulation, 2024, 36(4): 941-956. |
| [6] | Wang Cong, Yu Jiaying, Zhang Hongli. Multi-objective Energy-efficient No-wait Flow Shop Scheduling Based on Hybrid Discrete State Transition Algorithm [J]. Journal of System Simulation, 2024, 36(10): 2345-2358. |
| [7] | Xiangqian Wang, Puhao Guo, Xiangrui Meng. Simulation and Optimization of Integrated Production Logistics System of Underground Coal Mining, Dressing, and Backfilling [J]. Journal of System Simulation, 2023, 35(5): 907-919. |
| [8] | Chunmao Jiang, Zhenxing Yang. Partial Task Offloading Strategy of Cloud Robots Based on Game Theory under Cloud-Edge Coordination [J]. Journal of System Simulation, 2023, 35(5): 987-997. |
| [9] | Hongliang Zhang, Jingru Xu, Bo Tan, Gongjie Xu. Dual Resource Constrained Flexible Job Shop Energy-saving Scheduling Considering Delivery Time [J]. Journal of System Simulation, 2023, 35(4): 734-746. |
| [10] | Wei Chen, Yan Wang, Zhicheng Ji. Dynamics Modeling and Online Prediction of Energy Consumption of Discrete Manufacturing System [J]. Journal of System Simulation, 2023, 35(4): 760-772. |
| [11] | Chaoyang Zhang, Liping Xu, Jian Li, Yihao Zhao, Kui He. Flexible Job-Shop Scheduling Problem Based on Improved Wolf Pack Algorithm [J]. Journal of System Simulation, 2023, 35(3): 534-543. |
| [12] | Hongcai Ouyang, Dinghui Wu, Junyan Fan, Jing Wang. Multi-media Energy Planning Optimization of Steel Based on Improved MOEA/D [J]. Journal of System Simulation, 2023, 35(3): 568-578. |
| [13] | Ni Jing, Ma Mengke. Intercell Dynamic Scheduling Method Based on Deep Reinforcement Learning [J]. Journal of System Simulation, 2023, 35(11): 2345-2358. |
| [14] | Sen Zhang, Mengyan Zhang, Jingping Shao, Jiexin Pu. Multi-UAVs 3D Path Planning Method Based on Random Strategy Search [J]. Journal of System Simulation, 2022, 34(6): 1286-1295. |
| [15] | Jianlin Fu, Guofu Ding, Jian Zhang, Haifan Jiang, Peipei Guo. Multi-Objective Optimization Configuration of AGV System Based on Response Surface and NSGA-II [J]. Journal of System Simulation, 2022, 34(5): 994-1002. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||