Journal of System Simulation ›› 2023, Vol. 35 ›› Issue (1): 178-189.doi: 10.16182/j.issn1004731x.joss.21-0844
• Papers • Previous Articles Next Articles
Yali Wu1,2(
), Shuting He1,2, Yanxi Yang1,2, Lianqiang Feng3, Fuqiang Wang3, Yulu Chen1,2
Received:2021-08-19
Revised:2022-03-18
Online:2023-01-30
Published:2023-01-18
CLC Number:
Yali Wu, Shuting He, Yanxi Yang, Lianqiang Feng, Fuqiang Wang, Yulu Chen. Scheduling Optimization of Aluminum Extrusion Production Line Based on Timed Petri Net and BSO Algorithm[J]. Journal of System Simulation, 2023, 35(1): 178-189.
Table 1
Interpretation of places and transitions
| Pi | 含义 | Ti | 含义 |
|---|---|---|---|
| P1 | 上料,铝锭加热开始 | T1 | 分配加热设备 |
| P2 | 铝锭加热 | T2 | 卸载加热设备 |
| P3 | 加热结束,挤压开始 | T3 | 分配挤压机 |
| P4 | 上料,挤压开始 | T4 | 卸载挤压机 |
| P5 | 挤压结束,淬火开始 | T5 | 分配淬火炉 |
| P6 | 淬火加工 | T6 | 卸载淬火炉 |
| P7 | 淬火结束,拉伸开始 | T7 | 分配拉伸机 |
| P8 | 拉伸加工 | T8 | 卸载拉伸机 |
| P9 | 拉伸结束,成品锯开始 | T9 | 分配成品锯 |
| P10 | 成品锯加工 | T10 | 卸载成品锯 |
| P11 | 成品锯结束,定尺台开始 | T11 | 分配定尺台 |
| P12 | 定尺台加工L | T12 | 卸载定尺台 |
| P13 | 定尺台结束,包装开始 | T13 | 分配包装机 |
| P14 | 包装加工 | T14 | 卸载包装机 |
| P15 | 包装结束,下料 | ||
| P16 | 铝锭加热设备 | ||
| P17 | 挤压机 | ||
| P18 | 淬火炉 | ||
| P19 | 拉伸机 | ||
| P20 | 成品锯 | ||
| P21 | 定尺台 | ||
| P22 | 包装机 |
Table 2
Aluminum extrusion production task data
| 批次 | 加热 | 挤压 | 淬火 | 拉伸 | 成品锯 | 定尺 | 包装 |
|---|---|---|---|---|---|---|---|
| 01 | 110 | 174 | 121 | 183 | 102 | 190 | 150 |
| 02 | 80 | 120 | 176 | 174 | 199 | 160 | 115 |
| 03 | 86 | 167 | 148 | 160 | 166 | 138 | 130 |
| 04 | 95 | 97 | 76 | 64 | 110 | 181 | 173 |
| 05 | 102 | 87 | 86 | 80 | 90 | 83 | 75 |
| 06 | 113 | 80 | 42 | 99 | 70 | 90 | 93 |
| 07 | 85 | 69 | 72 | 54 | 80 | 90 | 160 |
| 08 | 84 | 69 | 120 | 24 | 96 | 89 | 62 |
| 09 | 66 | 50 | 88 | 46 | 63 | 76 | 150 |
| 10 | 74 | 97 | 74 | 82 | 53 | 61 | 95 |
| 11 | 100 | 170 | 120 | 103 | 102 | 100 | 150 |
| 12 | 99 | 120 | 176 | 174 | 199 | 160 | 115 |
| 13 | 89 | 170 | 158 | 120 | 160 | 140 | 130 |
| 14 | 102 | 97 | 76 | 64 | 110 | 181 | 173 |
| 15 | 111 | 87 | 86 | 80 | 90 | 83 | 75 |
| 16 | 77 | 80 | 42 | 99 | 70 | 90 | 93 |
| 17 | 86 | 169 | 87 | 65 | 80 | 92 | 130 |
| 18 | 75 | 79 | 120 | 54 | 106 | 88 | 100 |
| 19 | 94 | 50 | 88 | 46 | 63 | 76 | 150 |
| 20 | 78 | 97 | 74 | 82 | 53 | 61 | 95 |
| 1 | 李彦瑞, 杨春节, 张瀚文, 等. 流程工业数字孪生关键技术探讨[J]. 自动化学报, 2021, 47(3): 501-514. |
| Li Yanrui, Yang Chunjie, Zhang Hanwen, et al. Discussion on Key Technologies of Digital Twins in Process Industry[J]. Acta Automatica Sinica, 2021, 47(3): 501-514. | |
| 2 | 丁进良, 杨翠娥, 陈远东, 等. 复杂工业过程智能优化决策系统的现状与展望[J]. 自动化学报, 2018, 44(11): 1931-1943. |
| Ding Jinliang, Yang Cui'e, Chen Yuandong, et al. Current Status and Prospects of Intelligent Optimization Decision-Making Systems for Complex Industrial Processes[J]. Acta Automatica Sinica, 2018, 44(11): 1931-1943. | |
| 3 | 吴亚丽, 钱富才, 惠鏸. 间歇生产中过程调度的建模与分析[J]. 系统仿真学报, 2008, 20(5): 1146-1150, 1284. |
| Wu Yali, Qian Fucai, Hui Liu. Modeling and Analysis of Process Scheduling in Batch Production[J]. Journal of System Simulation, 2008, 20(5): 1146-1150, 1284. | |
| 4 | 潘春荣, 黎良. 基于可重入加工组合设备的建模与调度研究[J]. 系统仿真学报, 2016, 28(4): 772-782. |
| Pan Chunrong, Li Liang. Research on Modeling and Scheduling Based on Reentrant Machining Combined Equipment[J]. Journal of System Simulation, 2016, 28(4): 772-782. | |
| 5 | 吴大立, 郑中祥, 尹项根, 等. 基于Petri网和多种群遗传算法的海洋核动力平台电力系统网络重构[J]. 电力自动化设备, 2020, 40(8): 160-168. |
| Wu Dali, Zheng Zhongxiang, Yin Xianggen, et al. Power System Network Reconstruction of Marine Nuclear Power Platform Based on Petri Net and Multi-population Genetic Algorithm[J]. Electric Power Automation Equipment, 2020, 40(8): 160-168. | |
| 6 | Cheng Shi, Zhang Mingming, Ma Lianbo, et al. Brain Storm Optimization Algorithm for Solving Knowledge Spillover Problems[EB/OL]. (2020-06-21)[2021-01-12].. |
| 7 | Wu Y, Wang X, Li G, et al. Brain Storm Optimization Algorithm Based on Adaptive Inertial Selection Strategy for the RCPSP"[C]// 2019 Chinese Automation Congress (CAC) ( S2688-0938), Hangzhou, China. 2019: 2610-2615. |
| 8 | Alzaqebah Malek, Jawarneh Sana, Alwohaibi Maram, et al. Hybrid Brain Storm Optimization Algorithm and Late Acceptance Hill Climbing to Solve the Flexible Job-Shop Scheduling Problem[J/OL]. [2021-06-28]. . |
| 9 | Cheng Jian, Chen Jingjing, Guo Yinan, et al. Adaptive CCR-ELM with Variable-Length Brain Storm Optimization Algorithm for Class-Imbalance Learning[J]. Natural Computing (S1567-7818), 2021, 20(1): 11-22. |
| 10 | Wu Y, Wang X, Fu Y, et al. Many-objective Brain Storm Optimization Algorithm[J]. IEEE Access (S2169-3536), 2019, 7: 186572-186586.doi:10.1109/ACCESS.2019.296 0874 . |
| 11 | 闫世昌, 李文宏, 孙彦良. 基于Petri网与改进A*搜索算法的矿井机车调度优化[J]. 科学技术与工程, 2020, 20(15): 5990-5996. |
| Yan Shichang, Li Wenhong, Sun Yanliang. Mine Locomotive Scheduling Optimization Based on Petri Net and Improved A* Search Algorithm[J]. Science Technology and Engineering, 2020, 20(15): 5990-5996. | |
| 12 | 潘春荣, 熊文清. 稳态调度下单臂组合设备时间延迟分析与优化[J]. 控制理论与应用, 2019, 36(10): 1719-1729. |
| Pan Chunrong, Xiong Wenqing. Time Delay Analysis and Optimization of Single-arm Combined Equipment Under Steady-State Scheduling[J]. Control Theory and Applications, 2019, 36(10): 1719-1729. | |
| 13 | 刘倩, 杨建平, 王柏琳, 等. 基于"炉-机对应"的炼钢-连铸生产调度问题遗传优化模型[J]. 工程科学学报, 2020, 42(5): 645-653. |
| Liu Qian, Yang Jianping, Wang Bailin, et al. A Genetic Optimization Model for Steelmaking-Continuous Casting Production Scheduling Based on "Furnace-Machine Correspondence[J]. Journal of Engineering Science, 2020, 42(5): 645-653. | |
| 14 | 田松龄, 陈东祥, 王太勇, 等. 一种异步蚁群算法求解柔性作业车间调度问题[J]. 天津大学学报(自然科学与工程技术版), 2016, 49(9): 920-928. |
| Tian Songling, Chen Dongxiang, Wang Taiyong, et al. An Asynchronous Ant Colony Algorithm for Flexible Job Shop Scheduling Problems[J]. Journal of Tianjin University (Natural Science and Engineering Technology Edition), 2016, 49(9): 920-928. | |
| 15 | 李大成, 罗继亮, 孙莎莎, 等. 基于平行Petri网的制造系统调度与控制一体化方法[J/OL]. 自动化学报[2021-02-22]. . |
| Li Dacheng, Luo Jiliang, Sun Shasha, et al. Manufacturing System Scheduling and Control Integrated Method Based on Parallel Petri Nets[J/OL]. Acta Automatic Sinica[2021-02-22].. | |
| 16 | 刘慧霞, 李俊红, 王红梅, 等. 具有不可靠资源柔性制造系统的鲁棒控制器设计[J/OL]. 控制与决策[2021-07-26]. . |
| Liu Huixia, Li Junhong, Wang Hongmei, et al. Robust Controller Design for Flexible Manufacturing System with Unreliable Resources[J/OL]. Control and Decision[2021-07-26]. . | |
| 17 | Shi Y H. Brain Storm Optimization Algorithm[C]// Advances in Swarm Intelligence. Berlin Heidelberg: Springer, 2011: 303-309. |
| 18 | Vecchi Mario P, Kirkpatrick Scott. Global Wiring by Simulated Annealing[J]. IEEE Trans. on CAD of Integrated Circuits and Systems (S1937-4151), 1983, 2(4): 215-222. |
| 19 | 邵良杉, 王振, 李昌明. 基于模拟退火与改进粒子群的矿井通风优化算法[J/OL]. 系统仿真学报[2021-08-15].. |
| Shao Liangshan, Wang Zhen, Li Changming. Mineventilation Optimization Algorithm Based on Simulated Annealing and Improved Particle Swarm[J/OL]. Journal of System Simulation[2021-08-15]. . | |
| 20 | 林硕, 陈世佳, 韩忠华. 改进HNN算法求解柔性流水车间排产优化问题[J]. 控制工程, 2019, 26(9): 1667-1674. |
| Lin Shuo, Chen Shijia, Han Zhonghua. Improved HNN Algorithm to Solve the Optimization Problem of Flexible Flow Shop Scheduling[J]. Control Engineering, 2019, 26(9): 1667-1674. |
| [1] | Wang Linxuan, Liu Yongkui, Zhang Lin, Lin Tingyu, Wang Lihui. Anylogic-based Platform-Enterprise Collaborative Scheduling Simulation System for Cloud Manufacturing [J]. Journal of System Simulation, 2025, 37(9): 2225-2241. |
| [2] | Fan Zeng, He Mingjun, Xing Xiangyu. Research on Digital Simulation Method for Cognitive Load Evaluation of pilots [J]. Journal of System Simulation, 2025, 37(8): 1921-1932. |
| [3] | Gong Feng, Jiang Tao, Zhang Qin, Liu Yu. Simulation and Optimization of Support Processes for Aircraft Fleet Launch Under Limited Resources [J]. Journal of System Simulation, 2025, 37(8): 1965-1977. |
| [4] | Duan Xinhui, Cheng Zelong, Zhang Dongchao, Duan Xiaochong. Optimal Scheduling of an Integrated Energy System Considering Demand Response and Two-stage P2G [J]. Journal of System Simulation, 2025, 37(8): 2139-2151. |
| [5] | Ji Zhicheng, Quan Zhen, Wang Yan. Optimization and Simulation of Adaptive Production Scheduling Based on Hybrid Decision-making Mechanism [J]. Journal of System Simulation, 2025, 37(7): 1791-1803. |
| [6] | Chen Juan, Zheng Wang, Liu Qianqian, Lu Bin. Automatic Multi-objective Optimization Based on Dynamic Storage Location Allocation Strategy [J]. Journal of System Simulation, 2025, 37(6): 1435-1448. |
| [7] | Gu Wenbin, Qing Jiexia, Fang Jie, Liu Siqi. Improved Hybrid Optimization Algorithm for Multi-objective IPPS Problem [J]. Journal of System Simulation, 2025, 37(5): 1197-1209. |
| [8] | Yang Chao, Zheng Ruiqun, Li Zhen, Zhang Hongwei, Tang Yanqun, Li Dongze. Parallel Task Transmission and Processing Optimization Scheme for UAV-assisted Internet of Vehicles [J]. Journal of System Simulation, 2025, 37(3): 635-645. |
| [9] | Jiang Yuyan, Ma Ning, Li Yan, Gan Rumeijiang, Wang Fuyu. Collaborative Optimization Problem of Dynamic Pre-maintenance and Green Scheduling [J]. Journal of System Simulation, 2025, 37(2): 362-378. |
| [10] | Li Qiang, Qin Huawei, Qiao Bingqin, Wu Ruifang. An Algorithm for Cloud-based Web Service Combination Optimization Through Plant Growth Simulation [J]. Journal of System Simulation, 2025, 37(2): 462-473. |
| [11] | Li Xiang, Ren Xiaoyu, Zhou Yongbing, Zhang Jian. Research on Flexible Integrated Scheduling Under Stochastic Processing Times Based on Improved D3QN Algorithm [J]. Journal of System Simulation, 2025, 37(2): 474-486. |
| [12] | Zhang Runzhao, Chen Yanbo, Huang Tao, Tian Haoxin, Qiang Tuben, Zhang Zhi. Scheduling Method for Virtual Power Plants Based on Analysis and Forecasting of Heterogeneous Load Characteristics [J]. Journal of System Simulation, 2025, 37(12): 2994-3006. |
| [13] | Liu Weihong, Zhao Sixiang, Zhang Dali, Jiang Zhenhui. Dynamic Order Scheduling for Pick-and-pass System Considering Workload Balance and Learning Effects [J]. Journal of System Simulation, 2025, 37(10): 2613-2629. |
| [14] | Xuan Hua, Lü Lin, Li Bing. Distributed Heterogeneous Hybrid Flow-shop Scheduling Considering Combined Buffer [J]. Journal of System Simulation, 2025, 37(10): 2672-2686. |
| [15] | Liu Weiliang, Yan Qianwen, Zhang Qiliang, Liu Shuai, Liu Changliang, Kang Jiayao, Wang Xin. Optimal Scheduling of Vehicle-network Interaction Based on Interval Stackelberg Game of Virtual Power Plant [J]. Journal of System Simulation, 2024, 36(7): 1559-1572. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||