[1] Wang J W, Mao X H, Li Z Z, et al.Determining the Reasonable Scale of a Toll Highway Network in China[J]. Journal of Transportation Engineering (S0733-947X), 2014, 140(10): 1027-1041. [2] Shen L Y, Li H, Li Q M.Alternative Concession Model for Build Operate Transfer Contract Projects[J]. Journal of Construction Engineering and Management (S0733-9364), 2002, 128(4): 326-330. [3] Shen L Y, Bao H J, Wu Y Z, et al.Using Bargaining-game Theory for Negotiating Concession Period for BOT-type Contract[J]. Journal of Construction Engineering and Management (S0733-9364), 2007, 133(5): 385-392. [4] Ng S T, Xie J, Cheung Y K, et al.A Simulation Model for Optimizing the Concession Period of Public-private Partnerships Schemes[J]. International Journal of Project Management (S0263-7863), 2007, 25(8): 791-798. [5] Zhang X.Win-win Concession Period Determination Methodology[J]. Journal of Construction Engineering and Management (S0733-9364), 2009, 135(6): 550-558. [6] 宋金波, 王若宇, 宋丹荣. 高速公路BOT项目特许期决策模型[J]. 系统工程, 2014, 32(2): 91-97. Song Jinbo, Wang Ruoyu, Song Danrong.A Decision-making Model of the Concession Period for BOT Highway Projects[J]. Systems Engineering, 2014, 32(2): 91-97. [7] Lv J, Ye G, Liu W, et al.Alternative Model for Determining the Optimal Concession Period in Managing BOT Transportation Projects[J]. Journal of Management in Engineering (S0742-597X), 2015, 31(4): 1-7. [8] Wu M, Chau K W, Shen Q, et al.Net Asset Value-Based Concession Duration Model for BOT Contracts[J]. Journal of Construction Engineering and Management (S0733-9364), 2011, 138(2): 304-308. [9] Bianchini A.Fuzzy Representation of Pavement Condition for Efficient Pavement Management[J]. Computer-Aided Civil and Infrastructure Engineering (S1093-9687), 2012, 27(8): 608-619. [10] 张宏, 任芳敏, 郑荣贝. 基于系统动力学的高速公路维护管理系统仿真研究[J]. 系统仿真学报, 2016, 28(3): 676-682. Zhang Hong, Ren Fangmin, Zheng Rongbei.Simulation Research for Highway Maintenance Management System Based on System Dynamics[J]. Journal of System Simulation, 2016, 28(3): 676-682. [11] 王朝辉, 王丽君, 白军华, 等. 基于时段的沥青路面预防性养护时机与对策一体优化研究[J]. 中国公路学报, 2010, 23(5): 27-34. Wang Chaohui, Wang Lijun, Bai Junhua, et al.Research on Integration Optimization of Asphalt Pavement Preventive Maintenance Timing and Countermeasures During Period[J]. China Journal of Highway and Transport, 2010, 23(5): 27-34. [12] 杨梦柔. 高速公路养护全过程造价管理技术研究[D]. 西安: 长安大学, 2013. Yang Mengrou.The Technical Research of Cost Management Regarding the Whole Process of Highway Maintenance[D]. Xi’an: Changan University, 2013. [13] 王其藩. 系统动力学[M]. 北京: 清华大学出版社, 1998. Wang Qifan.System Dynamics[M]. Beijing: Tsinghua University Press, 1998. [14] Yao H, Shen L Y, Tan Y T, et al.Simulating the Impacts of Policy Scenarios on the Sustainability Performance of Infrastructure Projects[J]. Automation in Construction (S0926-5805), 2011, 20(8): 1060-1069. [15] Shin M Y, Lee H S, Park M S, et al.A System Dynamics Approach for Modeling Construction Workers’ Safety Attitudes and Behaviors[J]. Accident Analysis and Prevention (S0001-4575), 2014, 68(2): 95-105. [16] 刘克. 实用马尔可夫决策过程[M]. 北京: 清华大学出版社, 2004. Liu Ke.Practical Markov Decision Process[M]. Beijing: Tsinghua University Press, 2004. |