[1] 赵洁, 刘涤尘, 欧阳利平, 等. 大型压水堆核电机组与电网相互影响机制的研究[J]. 中国电机工程学报, 2012, 32(1): 64-69. (Zhao Jie, Liu Dichen, Ouyang Liping, et al.Analysis of the mutual interaction between large-scale pressurized water reactor nuclear power plants and power systems[J]. Proceedings of the CSEE, 2012, 32(1): 64-69.) [2] 黄岳峰, 徐政. 电力系统不同过程仿真中的核电站数学模型研究[J]. 机电工程, 2013, 30(12): 1546-1549. (Huang Yuefeng, Xu Zheng.Mathematical model of nuclear power plants for different power system processes[J]. Journal of Mechanical & Electrical Engineering, 2013, 30(12): 1546-1549.) [3] 谭金, 黄岳峰, 徐政. 基于Matlab-Simulink的详细核电站数学模型研究[J]. 中国电力, 2013, 46(7): 18-23. (Tan Jin, Huang Yuefeng, Xu Zheng.Studyfora Detailed Nuclear Power Unit Mathematical Model Based on Matlab-Simulink[J]. Electric Power, 2013, 46(7): 18-23.) [4] 赵洁, 刘涤尘, 熊莉, 等. 基于PSASP自定义模型的核电站动态响应仿真[J]. 核动力工程, 2010, 31(3): 113-117. (Zhao Jie, Liu Dichen, Xiong Li, et al.Simulation of Dynamic Response of Nuclear Power Plant Based on User-Defined Model in PSASP[J]. Nuclear Power Engineering, 2010, 31(3): 113-117.) [5] 丁卫东. 电网频率变化对压水堆机组运行的影响分析及应对措施[J]. 核动力工程, 2014, 35(2): 157-160. (Ding Weidong.Analysis and Countermeasures for Effects of Grid Frequency Change on PWR Unit[J]. Operation Nuclear Power Engineering, 2014, 35(2): 157-160.) [6] 赵宪萍, 牛永哲, 刘帅, 等. 压水堆核电站核功率控制模式的优化[J]. 上海电力学院学报, 2012, 28(6): 513-517. (Zhao Xianping, Niu Yongze, Liu Shuai, et al.Optimization of Reactor Power Control Models in PWR Nuclear Power Plants[J]. Journal of Shanghai University of Electric Power, 2012, 28(6): 513-517.) [7] 谢海斌, 张代兵, 沈林成. 基于MATLAB/SIMULINK与FLUENT的协同仿真方法研究[J]. 系统仿真学报, 2007, 19(8): 1824-1827, 1856. (Xie Haibin, Zhang Daibing, Shen Lincheng.Collaborative Simulation Based on MATLAB/Simulink and FLUENT[J]. Journal of System Simulation (S1004-731X), 2007, 19(8): 1824-1827, 1856.) [8] T Inoue, T Ichikawa, P Kundur, et al.Nuclear plant models for medium- to long-term power system stability studies[J]. IEEE Transactions on Power Systems, 1995, 10(1): 141-148. [9] 王锡凡. 现代电力系统分析 [M]. 北京: 科学出版社, 2003: 241-272. (Wang Xifan.Modern Power System Analysis [M]. Beijing, China: Science Press, 2003: 241-272.) [10] Kirby B, Kueck J, Leake H, et al.Nuclear generating stations and transmission grid reliability[C]// Power Symposium, 2007, Naps '07, North American. USA: IEEE, 2007: 279-287. [11] 余文奇, 彭波, 郑秀波. 压水堆核电机组负荷跟踪能力综述[J]. 中国能源, 2011, 33(3): 38-40, 45. (Yu Wenqi, Peng Bo, Zhen Xiubo.Review on load tracking capability of PWR nuclear power unit[J]. China Energy, 2011, 33(3): 38-40, 45.) [12] 彭波, 余文奇, 刘云. 国外核电站参与系统调峰情况分析[J]. 南方电网技术, 2011, 5(3): 23-26. (Peng Bo, Yu Wenqi, Liu Yun.Overview of Foreign Nuclear Power Plants in Load-Following[J]. Southern Power System Technology, 2011, 5(3): 23-26.) [13] 冯俊婷, 黄晓津, 张良驹. 核反应堆功率调节系统控制特性研究[J]. 原子能科学技术, 2006, 40(3): 306-310. (Feng Junting, Huang Xiaojin, Zhang Liangju.Study on Characteristic of Reactor Power Regulating System[J]. Atomic Energy Science and Technology, 2006, 40(3): 306-310. |