[1] 吴秀丽, 孙树栋, 余建军, 等. 多目标柔性作业车间调度优化研究[J]. 计算机集成制造系统, 2006, 12(5): 731-736. (Wu X L, Sun S D, Yu J J, et al.Research on multi-objective optimization for flexible job shop scheduling[J]. Computer Integrated Manufacturing Systems, 2006, 12(5): 731-736.) [2] 张国辉, 高亮, 李培根, 等. 改进遗传算法求解柔性作业车间调度问题[J]. 机械工程学报, 2009, 45(7): 145-151. (Zhang G, Gao L, Li P, et al.Improved Genetic Algorithm for the Flexible Job-shop Scheduling Problem[J]. Journal of Mechanical Engineering, 2009, 45(7): 145-151.) [3] Liu X, Zou F, Zhang X.Mathematical model and genetic optimization for shuffled flow shop scheduling problem based on energy consumption[C]// Control and Decision Conference, 2008. USA: IEEE, 2008: 1002-1007. [4] 蒋增强, 左乐. 低碳策略下的多目标柔性作业车间调度[J]. 计算机集成制造系统, 2015, 21(4): 1023-1031. (Jiang Zengqiang, Zuo Le.Multi-objective flexible job-shop scheduling based on low-carbon strategy[J]. Computer Integrated Manufacturing Systems, 2015, 21(4): 1023-1031.) [5] Muzaffar Eusuff, Kevin Lansey, Fayzul Pasha.Shuffled frog-leaping algorithm: a meme tic meta-heuristic for discrete optimization[J]. Engineering Optimization (S0305-215X), 2006, 38(2): 129-154. [6] Eusuff M M, Lansey K E.Optimization of Water Distribution Network Design Using the Shuffled Frog Leaping Algorithm[J]. Journal of Water Resources Planning & Management (S0733-9496), 2003, 129(3): 210-225. [7] Li J, Pan Q, Xie S.An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems[J]. Applied Mathematics& Computation (S0096-3003), 2012, 218(18): 9353-9371. [8] Xu Y, Wang L, Liu M, et al.An effective shuffled frog-leaping algorithm for shuffled flow-shop scheduling with multiprocessor tasks[J]. The International Journal of Advanced Manufacturing Technology (S0268-3768), 2013, 68(5): 1529-1537. [9] 张国辉, 党世杰. 考虑机器速度的低碳柔性作业车间调度问题研究[J]. 计算机应用研究, 2017, 33(4): 1072-1075. (Zhang Guo-hui, Dang Shi-jie.Research on low carbon flexible job shop scheduling problem considering machine speed[J]. Application Research of Computers, 2017, 33(4): 1072-1075.) [10] Lei D, Guo X.A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options[J]. International Journal of Production Research (S0020-7543), 2016, 54(16): 1-12. |