Monitoring Information Visualization for High-filling Loess Project

Zheng Liping, Chen Wei, Liao Ting, Lu Chang   

  1. School of Computer and Information, Hefei University of Technology, Hefei 230009, China
  • Received:2015-11-05 Published:2020-06-06

Abstract: The construction of high-filled loess project facessome engineering and technical challenges,such as large and complex earth excavation and earth backfilling operations. According to this situation, this paper presents a dynamic visualization methods for high-filled project based on 3D GIS. By establishing the model of high-filled loess, comparative analysis and visual analysis, dynamic simulation of high-filled loess project, visualization and analysis of Dig-Fill process and monitoring information arerealized. The results show that this visualization method can directly and accurately display the construction process, help decision makers master construction information and process.

Key words: high-filled loess project, 3D GIS, monitoring information, visualization