[1] 阮旻智, 李庆民, 彭英武, 等. 任意结构系统的备件满足率模型及优化方法[J]. 系统工程与电子技术, 2011, 32(8): 1799-1803. Ruan Minzhi, Li Qingmin, Peng Yingwu, et al.Model of spare part fill rate for systems of various structures and optimization method[J]. Systems Engineering and Electronics, 2011, 32(8): 1799-1803. [2] Paterson C, Kiesmüller G, Teunter R, et al.Inventory models with lateral transshipments: a review[J]. European Journal of Operational Research (S0377-2217), 2011, 210: 125-136. [3] Cesaro A, Pacciarelli D.Performance assessment for single echelon airport spare part management[J]. Computers & Industrial Engineering (S0360-8352), 2011(61): 150-160. [4] 阮旻智, 彭英武, 李庆民, 等. 基于体系保障度的装备备件三级库存方案优化[J]. 系统工程理论与实践, 2012, 32(7): 1623-1630. Ruan Minzhi, Peng Yingwu, Li Qingmin, et al.Optimzation of three-echelon inventory project for equipment spare parts based on system support deree[J]. Systems Engineering-Theory & Practice, 2012, 32(7): 1623-1630. [5] Gumus A T, Guneri A F.A multi-echelon inventory management framework for stochastic and fuzzy supply chains[J]. Expert Systems with Applications (S0957-4174), 2009, 36(3): 5565-5575. [6] Darwish M A, Odah O M.Vendor managed inventory model for single-vendor multi-retailer supply chains[J]. European Journal of Operational Research (S0377-2217), 2010, 204(3): 473-484. [7] Tiacci L, Saetta S.Reducing the mean supply delay of spare parts using lateral transshipments policies[J]. International Journal of Production Economics (S0925-5273), 2011, 133: 182-191. [8] 毛德军, 李庆民, 张志华. 以装备可用度为中心的保障方案优化方法[J]. 兵工学报, 2011, 32(5): 636-640. Mao Dejun, Li Qingmin, Zhang Zhihua.An Optimizing Method for Availability-Centric Equipment Support Plan[J]. Acta Armamentarii, 2011, 32(5): 636-640. [9] 罗祎, 阮旻智, 袁志勇. 多级维修供应下可修复备件库存建模与优化[J]. 系统工程理论与实践, 2013, 33(10): 2623-2630. Luo Yi, Ruan Minzhi, Yuan Zhiyong.Modeling and optimization of repairable spare parts under the multi-echelon maintenance supply[J]. Systems Engineering-Theory & Practice, 2013, 33(10): 2623-2630. [10] 阮旻智, 李庆民, 彭英武, 等. 串件拼修对策下多级维修供应的装备系统可用度评估[J]. 航空学报, 2012, 33(4): 658-665. Ruan Minzhi, Li Qingmin, Peng Yingwu, et al.Evaluation of Equipment System Availability for Multi-echelon[J]. Acta Aeronautica et Astronautica Sinica, 2012, 33(4): 658-665. [11] 阮旻智, 李庆民, 李承, 等. 改进的分层边际算法优化备件的初始配置方案[J]. 兵工学报, 2012, 33(10): 105-111. Ruan Minzhi, Li Qingmin, Li Cheng, et al.Improved-Layered-Marginal Algorithm to Optimize Initial Spare Part Configuration Project[J]. Acta Armamentarii, 2012, 33(10): 105-111. [12] Al-Rifai M H, Rossetti M D. An efficient heuristic optimization aglorithm for a two-echelon (R, Q) inventory system[J]. Intenational Journal of Production Economics (S0925-5273), 2007, 109(2): 195-213. |