1 |
朱文海, 张维刚, 倪阳咏, 等. 从计算机集成制造到 "工业 4.0"[J]. 现代制造工程, 2018, 448(1): 151-159.
|
|
Zhu Wenhai, Zhang Weigang, Ni Yangyong, et al. From Computer Integrated Manufacturing to "Industry 4.0"[J]. Modern Manufacturing Engineering, 2018, 448(1): 151-159.
|
2 |
Chaudhry I A, Khan A A. A Research Survey: Review of Flexible Job Shop Scheduling Techniques[J]. International Transactions in Operational Research(S0969-6016), 2016, 23(3): 551-591.
|
3 |
Toptal A, Sabuncuoglu I. Distributed Scheduling: a Review of Concepts and Applications[J]. International Journal of Production Research(S0020-7543), 2010, 48(18): 5235-5262.
|
4 |
Salmasnia A, Mirabadi-Dastjerd D. Joint Production and Preventive Maintenance Scheduling for a Single Degraded Machine by Considering Machine Failures[J]. Top(S1134-5764), 2017, 25(3): 544-578.
|
5 |
丁珮雯, 蒋祖华, 胡家文, 等. 带有交货期时间窗的生产与维护联合调度优化[J]. 上海交通大学学报, 2015, 49(4): 524-530.
|
|
Ding Peiwen, Jiang Zuhua, Hu Jiawen, et al. Integrating Production Scheduling and Preventive Maintenance for a Single Machine with Due Window[J]. Journal of Shanghai Jiaotong University, 2015, 49(4): 524-530.
|
6 |
Yang H, Li W, Wang B. Joint Optimization of Preventive Maintenance and Production Scheduling for Multi-State Production Systems Based on Reinforcement Learning[J]. Reliability Engineering & System Safety(S0951-8320), 2021, 214: 107713.
|
7 |
李健, 贾云杰, 陈栋, 等. 某航空标准件企业生产调度与设备维护联合优化[J]. 价值工程, 2019, 38(20): 268-273.
|
|
Li Jian, Jia Yunjie, Chen Dong, et al. Joint Optimization of Production Scheduling and Equipment Maintenance for an Aviation Standard Parts Enterprise[J]. Value Engineering, 2019, 38(20): 268-273.
|
8 |
Chansombat S, Pongcharoen P, Hicks C. A Mixed-Integer Linear Programming Model for Integrated Production and Preventive Maintenance Scheduling in the Capital Goods Industry[J]. International Journal of Production Research(S0020-7543), 2019, 57(1): 61-82.
|
9 |
Özgüven C, Özbakır L, Yavuz Y. Mathematical Models for Job-Shop Scheduling Problems with Routing and Process Plan Flexibility[J]. Applied Mathematical Modelling(S0307-904X), 2010, 34(6): 1539-1548.
|
10 |
Chen R, Yang B, Li S, et al. A Self-Learning Genetic Algorithm Based on Reinforcement Learning for Flexible Job-Shop Scheduling Problem[J]. Computers & Industrial Engineering(S0360-8352), 2020, 149: 106778.
|
11 |
Lei D, Li M, Wang L. A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem with Total Energy Consumption Threshold[J]. IEEE Transactions on Cybernetics(S2168-2267), 2018, 49(3): 1097-1109.
|
12 |
马慧民, 叶健飞. 柔性车间调度与设备维护的联合优化研究[J]. 机械设计与制造, 2015(7): 248-250.
|
|
Ma Huimin, Ye Jianfei. Multiobjective Joint Optimization of Production Scheduling and Maintenance Planning in the Flexible Job-Shop Problem[J]. Machinery Design & Manufacture, 2015(7): 248-250.
|
13 |
Dirk C, Rob J. [DB/OL][2020-06-08]. .
|
14 |
王国新, 宁汝新, 王爱民. 基于仿真的生产调度优化技术研究[J]. 计算机集成制造系统, 2007, 13(7): 1419-1427.
|
|
Wang Guoxin, Ning Ruxin, Wang Aimin. Production Optimal Scheduling Technology Based on Simulation[J]. Computer Integrated Manufacturing Systems, 2007, 13(7): 1419-1427.
|
15 |
Rajan N, Jaiswal S, Kalsi T, et al. Scheduling of Flexible Manufacturing System Using Genetic Algorithm (Multiobjective): A Review[J]. International Journal of Computer Applications(S0975-8887), 2014, 86(19): 9-15.
|