| [1] | 
																						 
											MacGregor J F, Kourti T. Statistical process control of multivariate processes[J]. Control Engineering Practice (S0967-0661), 1995, 3(3): 403-414.
																						 | 
										
																													
																							| [2] | 
																						 
											Wold S, Sjostrom M, Eriksson L.PLS-regression: a basic tool of chemometrics[J]. Chemometrics and Intelligent Laboratory Systems (S0169-7439), 2001, 58(2): 109-130.
																						 | 
										
																													
																							| [3] | 
																						 
											Godoy J L, Vega J R, Marchetti J L.A fault detection and diagnosis technique for multivariate processes using a PLS-decomposition of the measurement space[J]. Chemometrics and Intelligent Laboratory Systems (S0169-7439), 2013, 128: 25-36.
																						 | 
										
																													
																							| [4] | 
																						 
											Zhou D, Li G, Qin S J.Total projection to latent structures for process monitoring[J]. AIChE Journal (S1547-5905), 2010, 56(1): 168-178.
																						 | 
										
																													
																							| [5] | 
																						 
											Qin S J, Zheng Y.Quality-relevant and process-relevant fault monitoring with concurrent projection to latent structures[J]. AIChE Journal (S1547-5905), 2013, 59(2): 496-504.
																						 | 
										
																													
																							| [6] | 
																						 
											Kim D, Lee I B.Process monitoring based on probabilistic PCA[J]. Chemometrics and Intelligent Laboratory Systems (S0169-7439), 2003, 67(2): 109-123.
																						 | 
										
																													
																							| [7] | 
																						 
											Ghahramani Z, Geoffrey E H.The EM algorithm for mixtures of factor analyzers[R]. Technical Report CRG-TR-96-1, University of Toronto, 1997: 1-8.
																						 | 
										
																													
																							| [8] | 
																						 
											Hoskuldsson A.PLS regression methods[J]. Journal of Chemometrics (S0886-9383), 1988, 2(3): 211-228.
																						 | 
										
																													
																							| [9] | 
																						 
											Zhao Z, Li Q, Huang M, et al.Concurrent PLS-based process monitoring with incomplete input and quality measurements[J]. Computers and Chemical Engineering (S0098-1354), 2014, 67: 69-82.
																						 | 
										
																													
																							| [10] | 
																						 
											Zhou L, Chen J, Song Z, et al.Probabilistic latent variables regression model for process-quality monitoring[J]. Chemical Engineering Science (S0009-2509), 2014, 116: 296-305.
																						 | 
										
																													
																							| [11] | 
																						 
											赵忠盖, 刘飞. 因子分析及其在过程监控中的应用[J]. 化工学报,2007, 58(4): 970-974.Zhao Z G, Liu F. Factor analysis and its application to process monitoring[J]. Journal of Chemical Industry and Engineering (China)(S0438-1157), 2007, 58(4): 970-974.
																						 | 
										
																													
																							| [12] | 
																						 
											Chiang L H, Russell E L, Braatz R D.Fault detection and diagnosis in industrial systems[M]. Springer: London. 2001: 103-112.
																						 |