[1] Bergh J, Beliën J, Bruecker P.Personnel Scheduling: A Literature Review[J]. European Journal of Operational Research (S0377-2217), 2013, 226(3): 367-385. [2] Ağralı S, Taşkın Z C, Ünal A T.Employee Scheduling in Service Industries with Flexible Employee Availability and Demand[J]. Omega (S0305-0483), 2016, 66(Part A): 159-169. [3] Chen X, Thomas B W, Hewitt M.The Technician Routing Problem with Experience-based Service Times[J]. Omega (S0305-0483), 2016, 61(6): 49-61. [4] Chen X, Thomas B W, Hewitt M.Multi-period Technician Scheduling with Experience-based Service Times and Stochastic Customers[J]. Computers & Operations Research (S0305-0548), 2017, 82(6): 1-14. [5] Irawan C A, Ouelhadj D, Jones D, et al.Optimisation of Maintenance Routing and Scheduling for Offshore Wind Farms[J]. European Journal of Operational Research (S0377-2217), 2017, 256(1): 76-89. [6] Zamorano E, Stolletz R.Branch-and-price Approaches for the Multiperiod Technician Routing and Scheduling Problem[J]. European Journal of Operational Research (S0377-2217), 2017, 257(1): 55-68. [7] Garey M R, Johnson D S.Computers and Intractability: a Guide to the Theory of NP-completeness[M]. New York: W.H. Freeman & Co, 1979. [8] Khalfay A, Crispin A, Crockett K.A Review of Technician and Task Scheduling Problems, Datasets and Solution Approaches[C]// Intelligent Systems Conference. 2017: 288-296. [9] Zeng L, Zhao M, Liu Y.Airport Ground Workforce Planning with Hierarchical Skills: A New Formulation and Branch-and-price Approach[J]. Annals of Operations Research (S0254-5330), 2019, 275(1): 1-14. [10] Mathlouthi I, Gendreau M, Potvin J Y.Mixed Integer Linear Programming for a Multi-attribute Technician Routing and Scheduling Problem[J]. Information Systems & Operational Research (S0315-5986), 2017, 56(1): 1-17. [11] 安晓亭, 张梓琪. 基于改进蚁群优化的多目标资源受限项目调度方法[J]. 系统工程理论与实践, 2019, 39(2): 509-519. An Xiaoting, Zhang Ziqi.Multi-objective Resource Constrained Project Scheduling Problem Based on Improved ant Colony Optimization[J]. Systems Engineering-Theory & Practice, 2019, 39(2): 509-519. [12] Hojati M.A Greedy Heuristic for Shift Minimization Personnel Task Scheduling Problem[J]. Computers & Operations Research (S0305-0548), 2018, 100(12): 66-76. [13] 邢立宁, 陈英武, 蔡怀平, 等. 求解全局优化问题的智能遗传算法[J]. 系统仿真学报, 2006, 18(4): 1067-1069. Xing Lining, Chen Yingwu, Cai Huaiping, et al.Intelligent Genetic Algorithm for Global Optimization Problem[J]. Journal of System Simulation, 2006, 18(4): 1067-1069. [14] 刘振元. 服务系统中的多技能人员调度[M]. 北京: 清华大学出版社, 2019. Liu Zhenyuan.Multi-skilled Personnel Scheduling in Service System[M]. Beijing: Tsinghua University Press, 2019. [15] 邢立宁. 演化学习型智能优化方法及其应用研究[D]. 长沙: 国防科学技术大学信息系统与管理学院, 2009. Xing Lining.Research on the Learnable Intelligent Optimization Approaches and Its Applications[D]. Changsha: School of Information Systems and Management, National University of Defense and Technology, 2009. [16] 姚锋, 邢立宁, 李菊芳. 求解双层CARP优化问题的知识型遗传算法[J]. 系统工程理论与实践, 2014, 34(1): 239-247. Yao Feng, Xing Lining, Li Jufang, et al.Knowledge-based Genetic Algorithm to the Double Layer Capacitated Arc Routing Problems[J]. Systems Engineering-Theory & Practice, 2014, 34(1): 239-247. [17] 任子武, 伞冶. 自适应遗传算法的改进及在系统辨识中应用研究[J]. 系统仿真学报, 2006, 18(1): 41-43. Ren Ziwu, San Ye.Improved Adaptive Genetic Algorithm and Its Application Research in Parameter identification[J]. Journal of System Simulation, 2006, 18(1): 41-43. [18] 王雷, 蔡劲草, 李明. 基于正交试验的遗传算法参数优化[J]. 南京师范大学学报, 2016, 16(2): 81-85. Wang Lei, Cai Jingcao, Li Ming.Parameter Optimization of Genetic Algorithm Based on Orthogonal Experiment[J]. Journal of Nanjing Normal University, 2016, 16(2): 81-85. |