系统仿真学报 ›› 2023, Vol. 35 ›› Issue (1): 27-40.doi: 10.16182/j.issn1004731x.joss.21-0679

• 论文 • 上一篇    下一篇

多约束混流线平衡与排序优化问题研究

李珍萍1(), 施莹1, 吴凌云2   

  1. 1.北京物资学院 信息学院,北京 101149
    2.中国科学院数学与系统科学研究院,北京 100190
  • 收稿日期:2021-07-14 修回日期:2022-01-07 出版日期:2023-01-30 发布日期:2023-01-18
  • 作者简介:李珍萍(1966-),女,教授,博士,研究方向为优化建模与算法设计。E-mail:lizhenping66@163.com
  • 基金资助:
    国家自然科学基金(71771028);北京市自然科学基金(9212004);2018年北京市属高校高水平创新团队支持计划(HT20180510)

Research on Mixed Flow Line Balancing and Scheduling Optimization with Multiple Constraints

Zhenping Li1(), Ying Shi1, Lingyun Wu2   

  1. 1.School of Information, Beijing Wuzi University, Beijing 101149, China
    2.Academy of Mathematics and Systems Science, Chinese Academy of Sciences, Beijing 100190, China
  • Received:2021-07-14 Revised:2022-01-07 Online:2023-01-30 Published:2023-01-18

摘要:

针对G企业混流装配线设计不合理导致工位间负载不均衡及产品堆积现象,考虑工序与工位间匹配关系,节拍时间、工序优先关系等多约束,以减少工位数量、均衡工位间负载、减少产品等待时间为目标,建立混流装配线设计与产品排序问题的多目标混合整数规划模型,分别设计了分层算法和混合启发式算法;利用小规模算例验证了分层次算法的精确性,利用大规模算例验证了混合启发式算法高效性。基于本文算法对G企业装配线进行优化后,其工位间负载极差由15.6 min减少到0.1 min,优化后投产顺序对应的节拍时间降低了6 min。

关键词: 混流装配线, 平衡, 产品排序, 多目标混合整数规划, 分层次算法, 混合启发式算法

Abstract:

Aiming at the phenomena of unbalanced load between stations and product accumulation caused by unreasonable design of mixed flow line in G enterprise, based on the matching relationship between processes and stations, cycle time, process priority and other constraint, with the objectives of reducing the number of stations, balancing the workload between stations, and reducing the products waiting time, a multi-objective mixed integer programming model for mixed flow line balance and product scheduling problem is established. A hierarchical algorithm and a hybrid heuristic algorithm are designed respectively; the accuracy of the hierarchical algorithm is verified by small-scale examples, and the efficiency of the hybrid heuristic algorithm is verified by large-scale examples. After the optimization based on the algorithms of this paper, the difference of workload between stations of G enterprise is reduced from 15.6 minutes to 0.1 minutes, and the cycle time is reduced by 6 minutes.

Key words: mixed model assembly line, balance, product ranking, multi-objective mixed integer programming, hierarchical algorithm, hybrid heuristic algorithm

中图分类号: