[1] 唐捷, 任震, 高志华, 等. 峰谷分时电价的成本效益分析模型及其应用[J]. 电网技术, 2007, 31(6): 61-66. (Tang Jie, Ren Zhen, Gao Zhihua, et al. Cost-benefit Analysis Model and its Application of Peak-valley Time-of-use Electricity Price[J]. Power System Technology, 2007, 31(6): 61-66.) [2] 汪卫华, 张慧敏, 陈方. 用削峰填谷方法提高供电企业效益的分析[J]. 电网技术, 2004, 28(18): 79-81. (Wang Weihua, Zhang Huimin, Chen Fang.Analysis of Improving Profit of Power Supply Enterprises by Peak Load Shifting[J]. Power System Technology, 2004, 28(18): 79-81.) [3] 徐高强. 山西省煤矿区矿井水涌水量预测模型研究[D]. 太原: 太原理工大学, 2008: 41-67. (Xu Gaoqiang.The Forecast Model of Mine Water Discharge’s Research About Coal Mining Area in Shanxi Province [D]. Taiyuan, Shanxi, China: Taiyuan University of Technology, 2008: 41-67.) [4] 王苗. 基于灰色理论的矿井顶板涌水量预测模型的建立与应用 [D]. 山东: 山东科技大学, 2007: 23-38. (Wang Miao.Study on Forecast Model of Mine Roof Water Inrush based on Grey Syetem [D]. Shandong, China: Shandong University of Science and Technology, 2007: 23-38. [5] 钱家忠, 朱学愚, 吴剑锋, 等. 矿井涌水量的灰色马尔可夫预报模型[J]. 煤炭学报, 2000, 25(1): 71-75. (Qian Jiazhong, Zhu Xueyu, Wu Jianfeng, et al. Grey Markov Model for Predicting Mine Discharge[J]. Journal of China Coal Society, 2000, 25(1): 71-75.) [6] 周国雄, 吴敏. 基于改进的灰色预测的模糊神经网络控制[J]. 系统仿真学报, 2010, 22(10): 2333-2336. (Zhou Guoxiong, Wu Min.Fuzzy Neural Network Control Based on Improved Gray Prediction[J]. Journal of System Simulation (S1004-731X), 2010, 22(10): 2333-2336.) [7] 胡周君, 胡志刚, 丁长松. 一种基于灰色模型的资源可用性预测模型[J]. 系统仿真学报, 2010, 22(3): 791-799. (Hu Zhoujun, Hu Zhigang, Ding Changsong.Model for Resource Availability Prediction Based on Grey Model[J]. Journal of System Simulation (S1004-731X), 2010, 22(3): 791-799.) [8] 邓聚龙. 灰色系统理论教程 [M]. 北京: 华中理工大学出版社, 1990: 175-264. (Deng Julong.The Grey System Theory [M]. Beijing, China: Huazhong University Press, 1990: 175-264.) [9] Adam Jacobus van Staden, Jiangfeng Zhang, Xiaohua Xia. A Model Predictive Control Strategy for Load Shifting in a Water Pumping Scheme with Maximum Demand Charges[J]. Applied Energy(S0306-2619), 2011, 88(12): 4785-4794. [10] He Zhang, Xiaohua Xia, Jiangfeng Zhang.Optimal Sizing and Operation of Pumping Systems to Achieve Energy Efficiency and Load Shifting[J]. Electric Power Systems Research (S0378-7796), 2012, 86: 41-50. [11] 李国勇. 智能控制及其MATLAB实现 [M]. 北京: 电子工业出版社, 2005: 285-341. (Li Guoyong.Intelligent Control and its MATLAB Realization [M]. Beijing, China: Publishing House of Electronics Industry, 2005: 285-341.) [12] Xiangtao Zhuan, Xiaohua Xia.Development of Efficient Model Predictive Control Strategy for Cost-optimal Operation of a Water Pumping Station[J]. IEEE Transactions on Control Systems Technology (S1063-6536), 2013, 21(4): 1449-1454. [13] 郭长娜. 煤矿井下主排水泵节能与控制系统的研究 [D]. 阜新: 辽宁工程技术大学, 2011: 37-42. (Guo Changna.The Research on the Saving Energy and Control System of the Main Water Pumps for the Coal Mine [D]. Fuxin, China: Liaoning Technical University, 2011: 37-42.) [14] Xiangtao Zhuan, Xiaohua Xia.Optimal Operation Scheduling of a Pumping Station with Multiple Pumps[J]. Applied Energy(S0306-2619), 2013, 104: 250-257. [15] Uduakobong E Ekpenyong, Jiangfeng Zhang, Xiaohua Xia.An Improved Robust Model for Generator Maintenance Scheduling[J]. Electric Power Systems Research(S0378-7796), 2012, 92: 29-36. |