1 |
王军强, 孙树栋, 李翌辉. 考虑外包能力拓展的TOC产品组合优化研究(I)[J]. 系统仿真学报, 2006, 18(11): 3287-3293.
|
|
Wang Junqiang, Sun Shudong, Li Yihui. Research on TOC Product Portfolio Optimization Considering Outsourcing Capability Expansion(I)[J]. Journal of System Simulation, 2006, 18(11): 3287-3293.
|
2 |
潘春荣, 黎良. 印刷包装生产线的建模与仿真分析[J].系统仿真学报, 2014, 26(12): 2996-3002.
|
|
Pan Chunrong, Li Liang. Modeling and Simulation Analysis of Printing and Packaging Production Line[J].Journal of System Simulation, 2014, 26(12): 2996-3002.
|
3 |
Yan Z, Gu H, Xi Y. Modified Bottleneck-Based Heuristic for Large-Scale Job-Shop Scheduling Problems with a Single Bottleneck[J]. Journal of Systems Engineering and Electronics(S1004-4132), 2007, 18(3): 556-565.
|
4 |
Qi Lei, Tong Li. Identification Approach for Bottleneck Clusters in a Job Shop Based on Theory of Constraints and Sensitivity Analysis[J]. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture(S0954-4054), 2017, 231(6): 1091-1101.
|
5 |
Chen Chunlung, Chen Chuenlung. A Bottleneck-Based Heuristic for Minimizing Makespan in a Flexible Flow Line with Unrelated Parallel Machines[J]. Computers & Operations Research(S0305-0548), 2009, 36(11): 3073-3081.
|
6 |
Amin-Naseri M R, Beheshti-Nia M A. Hybrid Flow Shop Scheduling with Parallel Batching[J]. International Journal of Production Economics(S0925-5273), 2009, 117(1): 185-196.
|
7 |
Jia Zhiyang, Dai Yaping, Chen Jingchuan. Closed Bernoulli Lines with Finite Buffers: Real-time Performance Analysis, Completion Time Bottleneck and Carrier Control[J]. International Journal of Control(S0020-7179), 2019, 94(7): 1-14.
|
8 |
Matthias Thurer, Mark Stevenson. Bottleneck-oriented Order Release with Shifting Bottlenecks: An Assessment by Simulation[J]. International Journal of Production Economics(S0925-5273), 2018, 197(1): 275-282.
|
9 |
Liu Mingzhou, Tang Juan, Ge Maogen. Dynamic Prediction Method of Production Logistics Bottleneck Based on Bottleneck Index[J].Chinese Journal of Mechanical Engineering(S1000-9345), 2009, 22(5): 710-716.
|
10 |
徐泽水. 不确定多属性决策方法及应用[M]. 北京: 清华大学出版社, 2004.
|
|
Xu Zeshui. Uncertain Multi-attribute Decision Making Method and Its Application[M]. Beijing: Tsinghua University Press, 2004.
|
11 |
Cai Jingcao, Lei Deming. A Cooperated Shuffled Frog-Leaping Algorithm for Distributed Energy-Efficient Hybrid Flow Shop Scheduling with Fuzzy Processing Time[J]. Complex & Intelligent Systems(S2199-4536), 2021, 7(5): 1-19.
|
12 |
王彩璐, 陶跃钢, 杨鹏, 等. 云控制系统并行任务分配优化算法与并联控制[J]. 自动化学报, 2017, 43(11): 1973-1983.
|
|
Wang Cailu, Tao Yuegang, Yang Peng, et al. Parallel Task Allocation Optimization Algorithm and Parallel Control for Cloud Control System[J]. Automatica, 2017, 43(11): 1973-1983.
|
13 |
朱海峰, 刘畅, 温熙华, 等. 均衡流量和饱和度的交通瓶颈控制[J]. 控制理论与应用, 2019, 36(5): 816-824.
|
|
Zhu Haifeng, Liu Chang, Wen Xihua, et al. Traffic Bottleneck Control for Equalizing Flow and Saturation[J]. Control Theory and Applications, 2019, 36(5): 816-824.
|
14 |
Zuo Yan, Gu Hanyu, Xi Yugeng. Modified Bottleneck-Based Heuristic for Large-Scale Job-Shop Scheduling Problems with a Single Bottleneck[J]. Journal of Systems Engineering and Electronics(S1004-4132), 2007, 7(3): 556-565.
|
15 |
延渊渊, 范文慧, 冯袁. 汽车连杆生产线的建模与仿真[J]. 系统仿真学报, 2018, 30(9): 3360-3365, 3376.
|
|
Yan Yuanyuan, Fan Wenhui, Feng Yuan. Modeling and Simulation of Automobile Connecting Rod Production Line[J]. Journal of System Simulation, 2018, 30(9): 3360-3365, 3376.
|
16 |
李成川, 李聪波, 曹华军, 等. 基于GERT图的废旧零部件不确定性再制造工艺路线模型[J]. 计算机集成制造系统, 2012, 18(2): 298-305.
|
|
Li Chengchuan, Li Congbo, Cao Huajun, et al. An Uncertain Remanufacturing Process Model of Used Parts Based on GERT Diagram[J]. Computer Integrated Manufacturing Systems, 2012, 18(2): 298-305.
|