[1] 赵俊华, 文福拴, 薛禹胜, 等. 电力信息物理融合系统的建模分析与控制研究框架[J]. 电力系统自动化, 2011, 35(16): 1-8. Zhao J H, Wen F S, Xue Y S, et al.Modeling analysis and control research framework of cyber physical power systems[J]. Automation of Electric Power Systems, 2011, 35(16): 1-8. [2] 薛禹胜, 徐伟, 董朝阳, 等. 关于广域测量系统及广域控制保护系统的评述[J]. 电力系统自动化, 2007, 31(15): 1-5. Xue Y S, Xu W, Dong Z Y, et al.A Review of Wide Area Measurement System and Wide Area Control System[J]. Automation of Electric Power Systems, 2007, 31(15): 1-5. [3] 李鹏, 王成山, 黄碧斌, 等. 分布式发电微网系统暂态时域仿真方法研究—(一)基本框架与仿真算法[J]. 电力自动化设备, 2013, 33(2): 33-39. Li P, Wang C S, Huang B B, et al.Methodology of transient simulation in time domain for DG and microgrid(1): Basic framework and algorithm[J]. Electric Power Automation Equipment, 2013, 33(2): 33-39. [4] 余昆, 曹一家, 倪以信, 等. 分布式发电技术及其并网运行研究综述[J]. 河海大学学报, 2009, 37(6): 741-748. Yu K, Cao Y J, Ni Y X, et al.Review of research on distributed generation technology andits integrated operation[J]. Journal of Hohai University, 2009, 37(6): 741-748. [5] 董朝阳, 赵俊华, 文福拴, 等. 从智能电网到能源互联网: 基本概念与研究框架[J]. 电力系统自动化, 2014, 38(15): 1-11. Dong Z Y, Zhao J H, Wen F S, et al.From smart grid to energy internet: Basic concept and research framework[J]. Automation of Electric Power Systems, 2014, 38(15): 1-11. [6] 王继业, 孟坤, 曹军威, 等. 能源互联网信息技术研究综述[J]. 计算机研究与发展, 2015, 52(5): 1109-1126. Wang J Y, Meng K, Cao J W, et al.Information technology for energy internet: A survey[J]. Journal of Computer Research & Development, 2015, 52(5): 1109-1126. [7] 梅生伟, 王莹莹, 陈来军. 从复杂网络视角评述智能电网信息安全研究现状及若干展望[J]. 高电压技术, 2011, 37(3): 672-679. Mei S W, Wang Y Y, Chen L J.Overviews and prospects of the cyber security of smart grid from the view of complex network theory[J]. High Voltage Engineering, 2011, 37(3): 672-679. [8] 郭庆来, 辛蜀骏, 孙宏斌. 电力系统信息物理融合建模与综合安全评估:驱动力与研究构想[J]. 中国电机工程学报, 2016, 36(6): 1481-1489. Guo Q L, Xin S J, Sun H B.Power System Cyber Physical Modelling and Security Assessment: Motivation and Ideas[J]. Proceedings of the Csee, 2016, 36(6): 1481-1489. [9] 江全元, 白碧蓉, 邹振宇, 等. 计及广域测量系统时滞影响的TCSC控制器设计[J]. 电力系统自动化, 2004, 28(20): 21-25. Jiang Q Y, Bai B R, Zou Z Y, et al.TCSC Controller Design in Consideration of Time Delay in Wide-Area Measuring System[J]. Automation of Electric Power Systems, 2004, 28(20): 21-25. [10] 江全元, 邹振宇, 曹一家, 等. 考虑时滞影响的电力系统稳定分析和广域控制研究进展[J]. 电力系统自动化, 2005, 29(3): 1-7. Jiang Q Y, Zou Z Y, Cao Y J, et al.Overview of Power System Stability Analysis and Wide-area Control in Consideration of Time Delay[J]. Automation of Electric Power Systems, 2005, 29(3): 1-7. [11] Z Y Liu, Q Y Jiang, Y J Cao.Stability of Power System in Consideration of Signal Time Delays[C]. IEEE Power Engineering Society General Meeting, June 24, Tampa, FL, USA, 2007: 1246-1252. [12] 贾宏杰, 陈建华, 余晓丹. 时滞环节对电力系统小扰动稳定性的影响[J]. 电力系统自动化, 2006, 30(5): 5-8, 17. Jia H J, Chen J H, Yu X D.Impact of Time Delay on Power System Small Signal Stability[J]. Automation of Electric Power Systems, 2006, 30(5): 5-8, 17. [13] Hongjie Jia, Xiaodan Yu, Yixin Yu, et al.Power system small signal stability region with time delay[J]. Electrical Power and Energy Systems, 2008, 30: 16-22. [14] 刘兆燕, 戚军, 苗轶群, 等. 单时滞电力系统时滞稳定裕度的简便求解方法[J]. 电力系统自动化, 2008, 32(18): 8-13. Liu Z Y, Qi J, Miao Y Q, et al.A simple method to compute delay margin of power system with single delay[J]. Automation of Electric Power Systems, 2008, 32(18): 8-13. [15] 曾倬颖, 刘东. 光伏储能协调控制的信息物理融合建模研究[J]. 电网技术, 2013, 37(6): 1506-1513. Zeng Z Y, Liu D.Study on Cyber-Physical System Modeling on Coordinated Control of Photovoltaic Generation and Battery Energy Storage System[J]. Power System Technology, 2013, 37(6): 1506-1513. [16] W Ji, V Venkatasubramanian.Hard-limit Induced Chaos in a Fundamental Power System Model[J]. Electrical Power and Energy Systems, 1996, 18(5): 279-295. [17] 胡志祥, 谢小荣, 肖晋宇, 等. 广域测量系统的延迟分析及其测试[J]. 电力系统自动化, 2004, 28(15): 39-43. Hu Z X, Xie X R, Xiao J Y, et al.ANALYSIS AND TEST ON DELAYS IN THE WIDE AREA MEASURING SYSTEM[J]. Automation of Electric Power Systems, 2004, 28(15): 39-43. [18] 郑建辉, 孟昭勇, 林馨. 基于IEC61970/61968的发电厂资源CIM建模[J]. 电力自动化设备, 2010, 30(1): 106-109. Zheng J H, Meng Z Y, Lin X.CIM of power plant resource based on IEC61970 /61968[J]. Electric Power Automation Equipment, 2010, 30(1):106-109. [19] 修震, 吴平东, 黄杰, 等. 基于因特网的远程控制中网络延时特性分析[J]. 计算机工程与应用, 2004, 40(3): 129-131. Xiu Z, Wu P D, Huang J, et al.Analysis of Network Time-delay Property in Internet-based Telecontrol System[J]. Computer Engineering & Applications, 2004, 40(3):129-131. [20] 黄小庆, 白纯, 曹一家, 等. 基于公共信息模型的输电设备全景信息扩展建模[J]. 高压电技术, 2015, 41(12): 3929-3936. Huang X Q, Bai C, Cao Y J, et al.Panoramic information model extension for transmission equipment based on common information model[J]. High Voltage Engineering, 2015, 41(12): 3929-3936. |