| [1] |
刘一弓, 潘立新, 金晶. 挣值法在航空项目目标成本管理中的应用分析[J]. 航空科学技术, 2016, 27(11): 46-51.
|
|
Liu Yigong, Pan Lixin, Jin Jing. Research on Implementing Earned Value Method in Aeronautic Project's Target Cost Management[J]. Aeronautical Science & Technology, 2016, 27(11): 46-51.
|
| [2] |
曹建国. 数字化转型下航空发动机仿真技术发展机遇及应用展望[J]. 系统仿真学报, 2023, 35(1): 1-10.
|
|
Cao Jianguo. Development Opportunities and Application Prospects of Aero-engine Simulation Technology Under Digital Transformation[J]. Journal of System Simulation, 2023, 35(1): 1-10.
|
| [3] |
Kim B C. Probabilistic Evaluation of Cost Performance Stability in Earned Value Management[J]. Journal of Management in Engineering, 2016, 32(1): 04015025.
|
| [4] |
Soltan Sajad, Ashrafi Maryam. Predicting Project Duration and Cost, and Selecting the Best Action Plan Using Statistical Methods for Earned Value Management[J]. Journal of Project Management, 2020, 5(3): 157-166.
|
| [5] |
Khamooshi H, Abdi A. Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques[J]. Journal of Management in Engineering, 2017, 33(1): 04016032.
|
| [6] |
吉格迪, 杨康. 基于委托代理理论的建设项目多要素协同激励控制模型研究[J]. 工业工程, 2020, 23(1): 96-103.
|
|
Ji Gedi, Yang Kang. A Multi-factor Cooperative Incentive Control Model of Construction Projects Based on Principal Agent Theory[J]. Industrial Engineering Journal, 2020, 23(1): 96-103.
|
| [7] |
吴诗辉, 解江, 刘晓东, 等. 装备研制项目的模糊挣值管理方法[J]. 航空学报, 2017, 38(2): 254-268.
|
|
Wu Shihui, Xie Jiang, Liu Xiaodong, et al. Method of Fuzzy Earned Value Management for Weapon Equipment Development Project[J]. Acta Aeronautica et Astronautica Sinica, 2017, 38(2): 254-268.
|
| [8] |
徐梓灵, 刘晓东, 贺波. 基于CPM与风险等级的大型复杂项目模糊挣值管理理论[J]. 数学的实践与认识, 2025, 55(4): 1-16.
|
|
Xu Ziling, Liu Xiaodong, He Bo. Earned Value Management Theory of Large-scale and Complex Projects Based on CPM and Risk Levels[J]. Mathematics in Practice and Theory, 2025, 55(4): 1-16.
|
| [9] |
Cao Ping, Li Danyang, Cao Zhi, et al. Research on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method[J]. Buildings, 2025, 15(8): 1285.
|
| [10] |
陈英, 田娜, 陈夏燕, 等. 基于挣值法的军工科研项目管理实践[J]. 项目管理技术, 2024, 22(12): 160-164.
|
|
Chen Ying, Tian Na, Chen Xiayan, et al. Practice of Military Research Project Management Based on Earned Value Method[J]. Project Management Technology, 2024, 22(12): 160-164.
|
| [11] |
廖伟, 宁延. 挣值管理在项目完工预测中的应用与改进: 研究综述[J]. 科技管理研究, 2023, 43(11): 185-190.
|
|
Liao Wei, Ning Yan. Application and Improvement of Earned Value Management in Project Completion Prediction: A Review[J]. Science and Technology Management Research, 2023, 43(11): 185-190.
|
| [12] |
牟强, 贾广社. 改进固定工期大中型工程的完工成本估算[J]. 中国管理科学, 2018, 26(4): 180-187.
|
|
Mou Qiang, Jia Guangshe. Improving Cost Estimate at Completion of the Duration-fixed Mega Construction Project[J]. Chinese Journal of Management Science, 2018, 26(4): 180-187.
|
| [13] |
Zhong Shuheng, Wang Xin. Improvement and Application of Earned Value Analysis in Coal Project Management[J]. Procedia Engineering, 2011, 26: 1983-1989.
|
| [14] |
Narbaev Timur, Alberto De Marco. Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion[J]. Journal of Construction Engineering and Management, 2014, 140(1): 04013038.
|
| [15] |
Bagherpour Morteza, Mohammad Khaje Zadeh, Mahmoudi Amin, et al. Interpretive Structural Modeling in Earned Value Management[J]. Journal of Civil Engineering and Management, 2020, 26(6): 524-533.
|
| [16] |
肖依永, 常文兵, 周晟瀚, 等. 现代装备系统经济性工程(理论、方法与应用)[M]. 北京: 科学出版社, 2022: 165-173.
|
| [17] |
Seyed Taha Hossein Mortaji, Noorossana Rassoul, Bagherpour Morteza. Project Completion Time and Cost Prediction Using Change Point Analysis[J]. Journal of Management in Engineering, 2015, 31(5): 04014086.
|
| [18] |
Mahmoudi Amin, Bagherpour Morteza, Saad Ahmed Javed. Grey Earned Value Management: Theory and Applications[J]. IEEE Transactions on Engineering Management, 2021, 68(6): 1703-1721.
|
| [19] |
Setyopurnomo Rudy, Sudarso Kaderi Wiryono, Yuliani Dwi Lestari, et al. Incorporating Earned Value Management Into Income Statements to Improve Project Management Profitability and Elevate Application in the Business and Management[J]. PLoS One, 2025, 20(1): e0312956.
|
| [20] |
Aramali V, Gibson G E, Sanboskani H, et al. Enhancing Project Success: The Impact of Sociotechnical Integration on Project and Program Management Using Earned Value Management Systems[J]. International Journal of Managing Projects in Business, 2024, 17(8): 1-21.
|
| [21] |
赵韩, 武照云, 韦艳丽, 等. 复杂产品开发过程仿真与预测研究[J]. 系统仿真学报, 2009, 21(22): 7350-7354, 7358.
|
|
Zhao Han, Wu Zhaoyun, Wei Yanli, et al. Research on Complex Product Development Process Simulation and Prediction[J]. Journal of System Simulation, 2009, 21(22): 7350-7354, 7358.
|
| [22] |
王爱文, 曲慧杨, 周军华, 等. 虚拟采办全寿命周期管理技术研究及应用[J]. 系统仿真学报, 2012, 24(10): 2126-2130.
|
|
Wang Aiwen, Qu Huiyang, Zhou Junhua, et al. Research and Application on SBA Life-cycle Management Technology[J]. Journal of System Simulation, 2012, 24(10): 2126-2130.
|
| [23] |
田畇, 袁莹莹, 曹金龙, 等. 复杂装备研制项目的动态挣值管理与可视化技术[J]. 系统工程, 2014, 32(4): 45-53.
|
|
Tian Yun, Yuan Yingying, Cao Jinlong, et al. Dynamic EVM and Its Visualization for Complex Equipment Development Projects[J]. Systems Engineering, 2014, 32(4): 45-53.
|
| [24] |
Mohammad Reza Hasanzadeh, Behrooz Arbab Shirani, Gholam Ali Raissi Ardali. An Improved Performance Measurement Approach for Knowledge-based Companies Using Kalman Filter Forecasting Method[J]. Mathematical Problems in Engineering, 2016, 2016(1): 4831867.
|
| [25] |
詹伟, 杨超. 基于蒙特卡洛模拟和挣值分析的项目完工预测优化[J]. 科技管理研究, 2019, 39(17): 214-219.
|
|
Zhan Wei, Yang Chao. Optimization of Forecast at Completion Based on Monte Carlo Simulation and Earned Value Analysis[J]. Science and Technology Management Research, 2019, 39(17): 214-219.
|
| [26] |
Damavandi Majid, Tavakoli Mahdieh, Jolai Fariborz. Project Cost Forecasting Based on Earned Value Management and Markov Chain[J]. Annals of Operations Research, 2025, 351(1): 1023-1048.
|
| [27] |
Sackey Solomon, Lee Dong-Eun, Kim Byung-Soo. Duration Estimate at Completion: Improving Earned Value Management Forecasting Accuracy[J]. KSCE Journal of Civil Engineering, 2020, 24(3): 693-702.
|
| [28] |
Panquet Quentin, Bourgault Mario, Pellerin Robert, et al. A Process-improvement Method for Implementing Earned Value-based Project Management in Organizations[J]. Journal of Construction Engineering and Management, 2024, 150(12): 04024170.
|