[1] Meisel F, Bierwirth C.A framework for integrated berth allocation and crane operations planning in seaport container terminals[J]. Transportation Science (S0041-1655), 2013, 47(2): 131-147. [2] Yang C H, Regan A C.A multi-criteria decision support methodology for implementing truck operation strategies[J]. Transportation (S0049-4488), 2013, 40(3): 713-728. [3] Nair R, Miller-Hooks E.Fleet management for vehicle sharing operations[J]. Transportation Science (S0041-1655), 2011, 45(4): 524-540. [4] Zhao J, Dessouky M, Bukkapatnam S.Optimal slack time for schedule-based transit operations[J]. Transportation Science (S0041-1655), 2006, 40(4): 529-539. [5] 李冰, 郝越, 轩华. 基于排队网络的运输排队过程研究[J]. 重庆交通大学学报, 2012, 31(4): 293-298. (Li B, Hao Y, Xuan H.Transportation queuing processes research based on queuing network[J]. Journal of Chongqing Jiaotong University (S1009-9794), 2012, 31(4): 293-298.) [6] MacGregor S. System capacity and performance modelling of finite buffer queueing networks[J]. International Journal of Production Research (S0020-7543), 2014, 52(11): 3125-3163. [7] Yu V S.Control and observation for dynamical queueing networks. I.[J] Automation and Remote Control (S0005-1179), 2014, 75(3): 422-446. [8] Chan W P, Hyo S L.Approximation analysis of multi-class closed queueing maintenance networks with a parts inventory system and two-phase Coxian time distributions[J]. Computers & Operations Research (S0305-0548), 2014, 46(1): 23-37. [9] Fang D, Mark P, Van O, et al. Dynamic control of the N queueing network with application to shipbuilding[J]. International Journal of Production Research (S0020-7543), 2014, 52(4): 967-984. [10] Thomas H, Dirk C M.Integration of vehicle routing and resource allocation in a dynamic logistics network[J]. Transportation Research Part C (S0968-090X), 2009, 17(2): 149-162. [11] Malairajan R A, Ganesh K, Matti M, et al. CLING: heuristic to solve integrated resource allocation and routing problem with time window[J]. International Journal of Services and Operations Management (S1744-2370), 2012, 13(2): 247-266. [12] Ning S, Haiqing S, Warren B P.The dynamic fleet management problem with uncertain demand and customer chosen service level[J]. International Journal of Production Economics (S0925-5273), 2014, 148(2): 110-121. [13] Dariusz R. Kowalski, Eyal N, Michael S, et al. Scheduling problems in transportation networks of line topology[J]. Optimization Letters (S1862-4472), 2014, 8(2): 777-799. [14] Suhng B M, Lee W.A new link-based single tree building algorithm for shortest path searching in an urban road transportation network[J]. Journal of Electrical Engineering & Technology (S2325-9833), 2013, 8(4): 889-898. [15] Shen X Y, Xie C J, Liu H X, et al. Model and algorithm for routing and scheduling problem in hazardous material stransportation network[J]. Journal of Networks (S1796-2056), 2013, 8(5): 1027-1034. [16] Uester H, Kewcharoenwong P.Strategic design and analysis of a relay network in truckload transportation[J]. Transportation Science (S0041-1655), 2011, 45(4): 505-523. [17] Farahani R Z, Miandoabchi E, Szeto W Y.A review of urban transportation network design problems[J]. European journal of operational research (S0377-2217), 2013, 229(2): 281-302. [18] Anghinolfi D, Paolucci M, Sacone S.Freight transportation in railway networks with automated terminals: a mathematical model and MIP heuristic approaches[J]. European journal of operational research (S0377-2217), 2011, 214(3): 558-59. |