| 1 |
单忠德, 汪俊, 张倩. 批量定制柔性生产的数字化、智能化、网络化制造发展[J]. 物联网学报, 2021, 5(3): 1-9.
|
|
Shan Zhongde, Wang Jun, Zhang Qian. Development of Digital Intelligent Networked Manufacturing for Flexible Customized Manufacturing[J]. Chinese Journal on Internet of Things, 2021, 5(3): 1-9.
|
| 2 |
高亮, 张国辉, 王晓娟. 柔性作业车间调度智能算法及其应用[M]. 武汉: 华中科技大学出版社, 2012: 3-23.
|
|
Gao Liang, Zhang Guohui, Wang Xiaojuan. Flexible Job Shop Scheduling Intelligent Algorithm and Its Application[M]. Wuhan: Huazhong University of Science & Technology Press, 2012: 3-23.
|
| 3 |
陈魁, 毕利, 王文雅. 柔性作业车间AGV与机器双资源集成调度研究[J]. 系统仿真学报, 2022, 34(3): 461-469.
|
|
Chen Kui, Bi Li, Wang Wenya. Research on Integrated Scheduling of AGV and Machine in Flexible Job Shop[J]. Journal of System Simulation, 2022, 34(3): 461-469.
|
| 4 |
郭沛佩, 付建林, 江海凡, 等. 基于规则的柔性作业车间机床与AGV联合调度优化[J]. 制造技术与机床, 2021(9): 107-113.
|
|
Guo Peipei, Fu Jianlin, Jiang Haifan, et al. Rule-Based Optimization of Joint Scheduling of Machine and AGV in Flexible Job Shop[J]. Manufacturing Technology & Machine Tool, 2021(9): 107-113.
|
| 5 |
贺仁杰, 陈宇宁, 姚锋, 等. 求解柔性车间作业调度的知识型协同演化方法[J]. 计算机集成制造系统, 2011, 17(2): 310-315.
|
|
He Renjie, Chen Yuning, Yao Feng, et al. Knowledge-Based Co-evolutionary Approach for Flexible Job Shop Scheduling[J]. Computer Integrated Manufacturing Systems, 2011, 17(2): 310-315.
|
| 6 |
张于贤, 丁修坤, 沈烨, 等. 基于记忆曲线的ACO在柔性作业车间的调度优化[J]. 系统科学学报, 2016, 24(3): 62-66.
|
|
Zhang Yuxian, Ding Xiukun, Shen Ye, et al. Scheduling Optimization of Ant Colony Algorithm in Flexible Job Shop Based on Memory Curve Model[J]. Chinese Journal of Systems Science, 2016, 24(3): 62-66.
|
| 7 |
徐立云, 杨守银, 李爱平, 等. 生产车间布局多目标优化及其仿真分析[J]. 机械设计与研究, 2011, 27(6): 55-59.
|
|
Xu Liyun, Yang Shouyin, Li Aiping, et al. Multi-objective Optimization for Facility Layout and Its Simulation Analysis [J]. Machine Design and Research, 2011, 27(6): 55-59.
|
| 8 |
王解法, 冯祖仁, 李世敬, 等. 柔性制造系统(FMS)刀具建模、调度仿真研究[J]. 系统仿真学报, 2003, 15(9): 1211-1213, 1217.
|
|
Wang Jiefa, Feng Zuren, Li Shijing, et al. Research on Tool Assembly Model and Schedule Simulation in FMS[J]. Journal of System Simulation, 2003, 15(9): 1211-1213, 1217.
|
| 9 |
余刚, 郑秉霖, 柴天佑. 面向过程建模的选矿生产计划调度仿真系统[J]. 系统仿真学报, 2010, 22(3): 593-600.
|
|
Yu Gang, Zheng Binglin, Chai Tianyou. Process Modeling Oriented Production Planning and Scheduling Simulation System for Mineral Processing[J]. Journal of System Simulation, 2010, 22(3): 593-600.
|
| 10 |
叶启付, 李国丛, 单振刚, 等. 多品种小批量壳体生产单元布局仿真优化[J]. 航天制造技术, 2015(6): 53-57.
|
|
Ye Qifu, Li Guocong, Shan Zhengang, et al. Simulation and Optimization in A Multi-varieties and Small-Batch Shell Manufacturing Cells Layout[J]. Aerospace Manufacturing Technology, 2015(6): 53-57.
|
| 11 |
熊俊涛, 李中行, 林国茂, 等. 基于交互式控制的AGV实时仿真系统研究[J]. 系统仿真学报, 2021, 33(3): 657-668.
|
|
Xiong Juntao, Li Zhongxing, Lin Guomao, et al. Research on AGV Simulation System Based on Interactive Control[J]. Journal of System Simulation, 2021, 33(3): 657-668.
|
| 12 |
上官春霞, 石梅. 柔性制造系统重调度的仿真建模与分析[J]. 机械科学与技术, 2015, 34(8): 1206-1210.
|
|
Shangguan Chunxia, Shi Mei. Modeling and Analysis for Rescheduling in the Flexible Manufacturing System[J]. Mechanical Science and Technology for Aerospace Engineering, 2015, 34(8): 1206-1210.
|
| 13 |
Bazzano F, Gentilini F, Lamberti F, et al. Immersive Virtual Reality-Based Simulation to Support the Design of Natural Human-Robot Interfaces for Service Robotic Applications[C]// Augmented Reality, Virtual Reality, and Computer Graphics. Cham: Springer International Publishing, 2016: 33-51.
|
| 14 |
刘韵, 胡毅, 罗企, 等. 一种解决柔性车间作业调度问题的粒子群优化算法[J]. 组合机床与自动化加工技术, 2015(12): 144-147.
|
|
Liu Yun, Hu Yi, Luo Qi, et al. Solving Flexible Job-Shop Scheduling Problem with a Particle Swarm Optimization Algorithm[J]. Modular Machine Tool & Automatic Manufacturing Technique, 2015(12): 144-147.
|
| 15 |
张国辉, 高亮, 李培根, 等. 改进遗传算法求解柔性作业车间调度问题[J]. 机械工程学报, 2009, 45(7): 145-151.
|
|
Zhang Guohui, Gao Liang, Li Peigen, et al. Improved Genetic Algorithm for the Flexible Job-Shop Scheduling Problem[J]. Journal of Mechanical Engineering, 2009, 45(7): 145-151.
|
| 16 |
唐红涛, 刘家毅. 改进的布谷鸟算法求解考虑运输时间的分布式柔性流水车间调度问题[J]. 运筹与管理, 2021, 30(11): 76-83.
|
|
Tang Hongtao, Liu Jiayi. An Improved Cuckoo Algorithm for Distributed Flexible Flow-Shop Scheduling Problem with Transport Time Consideration[J]. Operations Research and Management Science, 2021, 30(11): 76-83.
|
| 17 |
陆曈曈, 陈平, 万兴余. 一种求解多目标柔性作业车间调度问题的改进元胞遗传算法[J]. 现代制造工程, 2016(11): 41-49.
|
|
Lu Tongtong, Chen Ping, Wan Xingyu. Improved Cellular Genetic Algorithm for Solving the Multi-objective Flexible Job Shop Scheduling Problem[J]. Modern Manufacturing Engineering, 2016(11): 41-49.
|
| 18 |
Xia Weijun, Wu Zhiming. An Effective Hybrid Optimization Approach for Multi-objective Flexible Job-Shop Scheduling Problems[J]. Computers & Industrial Engineering (S0360-8352), 2005, 48(2): 409-425.
|
| 19 |
Li Junqing, Pan Quanke, Tasgetiren M F. A Discrete Artificial Bee Colony Algorithm for the Multi-objective Flexible Job-Shop Scheduling Problem with Maintenance Activities[J]. Applied Mathematical Modelling (S0307-904X), 2014, 38(3): 1111-1132.
|
| 20 |
杨智飞, 苏春, 胡祥涛, 等. 面向智能生产车间的多AGV系统多目标调度优化[J]. 东南大学学报(自然科学版), 2019, 49(6): 1033-1040.
|
|
Yang Zhifei, Su Chun, Hu Xiangtao, et al. Multi-objective Scheduling Optimization for Multi-AGV Systems of Intelligent Jobshop[J]. Journal of Southeast University(Natural Science Edition), 2019, 49(6): 1033-1040.
|
| 21 |
徐云琴, 叶春明, 曹磊. 含有AGV的柔性车间调度优化研究[J]. 计算机应用研究, 2018, 35(11): 3271-3275.
|
|
Xu Yunqin, Ye Chunming, Cao Lei. Research on Flexible Job-Shop Scheduling Problem with AGV Constraints[J]. Application Research of Computers, 2018, 35(11): 3271-3275.
|
| 22 |
Xie Naiming, Chen Nanlei. Flexible Job Shop Scheduling Problem with Interval Grey Processing Time[J]. Applied Soft Computing (S1568-4946), 2018, 70: 513-524.
|
| 23 |
Zhu Zhenwei, Zhou Xionghui. A Multi-objective Multi-micro-swarm Leadership Hierarchy-Based Optimizer for Uncertain Flexible Job Shop Scheduling Problem with Job Precedence Constraints[J]. Expert Systems with Applications (S0957-4174), 2021, 182: 115214.
|
| 24 |
卢冰原, 陈华平, 古春生, 等. 基于模糊逻辑的偏柔性工作车间调度模型[J]. 中国管理科学, 2004(6): 53-56.
|
|
Lu Bingyuan, Chen Huaping, Gu Chunsheng, et al. The Model for Partial Flexible Job-Shop Scheduling Problem Based on Fuzzy Logic[J]. Chinese Journal of Management Science, 2004(6): 53-56.
|
| 25 |
Nishi T, Maeno R. Petri Net Decomposition Approach to Optimization of Route Planning Problems for AGV Systems[J]. IEEE Transactions on Automation Science and Engineering (S1545-5955), 2010, 7(3): 523-537.
|