[1] Eugene G Hill.Overview of Federal Aviation Administration Aviation Safety Research for Aircraft Icing[R]. AIAA Paper, 2006: 81. [2] Reehorst, Ghung J, Potapczuk M. Study of Icing Effects on Performance and Controllability of an Accident Aircraft[J]. Journal of Aircraft, 2000, 37(2): 2253-2259. [3] Norin A, Andersson T, Peter Värbr, et al.A GRASP Heuristic for Scheduling De-icing trucks at Stockholm Arlanda Airport[C]. Published in the proceedings of the 6th INO Workshop,2007. [4] Lee J T, Chen S, Daskalakis A.Deicing decision support tool[C]. Digital Avionics Systems Conference. IEEE, 2004. [5] Mao X, Ter Mors A W, Roos N, et al. Agent-based scheduling for aircraft deicing[C]// Conference on Artificial Intelligence. Reston, VA, USA: AIAA, 2007: 229-236. [6] Hanaoka S, Saraswati B.Low Cost Airport Terminal Locations and Configurations[J]. Journal of Air Transport Management (S0969-6997), 2011, 17(5): 314-319. [7] 沈文兴. 基于排队论的机场除冰问题研究[D]. 大连: 大连理工大学, 2013. Shen Wenxing.Research on Airport Deicing Based on Queuing Theory[D]. Dalian: Dalian University of Technology, 2013. [8] Zhang H B, Shi D H.Analysis of Two Queueing Models with Explicit Rate Operators and Stationary Distributions[J]. International Journal of Information and Management Sciences (S0268-4012), 2011, 12(22): 70-81. [9] Mayhew L, Smith D.Using Queuing Theory to Analyse the Government’s 4-h Completion Time Target in Accident and Emergency Departments[J]. Health Care Management Science (S1386-9620), 2008, 11(1): 11-21. [10] 李兵, 逯斌飞, 苏丹, 等. 飞机除冰服务资源的并行机调度方法[J]. 信息与控制, 2012, 41(5): 644-649. Li Bing, Lu Binfei, Su Dan, et al.A Parallel Machine Scheduling Algorithm for Aircraft De-Icing Service Resources[J]. Information and Control, 2012, 41(5): 644-649. [11] Xing Zhiwei, Li Yi.Research of Algorithms for Aircraft Ground Deicing Operation Scheduling Model[C]. Proceedings of the 8th World Congress on Intelligent Control and Automation, Jinan, China, 2010: 5973-5974. [12] 邢志伟, 王桂芳, 李轶. 飞机地面除冰运行延误分析与调度方法[J]. 信息与控制, 2010, 39(6): 743-748. Xing Zhiwei, Wang Guifang, Li Yi.Daly Analysis and Scheduling Method for Aircraft Ground Deicing Operation[J]. Information and Control, 2010, 39(6): 743-748. [13] Wu Mengli, Li Luyao, Chen Bin. Optimization Research of the Aircraft Deicing Problem[J]. Advanced Materials Research (S1022-6680), 2012, 616/618(12):4. [14] TP Yang.Aircraft Ground Deicing Operation Process Model[J]. Journal of Civil Aviation University of China (S1674-5590), 2010, 28(3): 5-10. [15] 陈斌, 王立文. 飞机除冰液地面除冰过程模型仿真与实验[J]. 系统仿真学报, 2012, 24(3): 556-560. Chen Bin, Wang Liwen.Model Simulation and Experiment of Aircraft Deicing Process Using Deicing Fluids on Ground[J]. Journal of System Simulation, 2012, 24(3): 556-560. |