1 |
尹嘉男, 胡明华, 彭瑛, 等. 相关进近模式下多跑道时空资源优化调度方法[J]. 航空学报, 2014, 35(11): 3064-3073.
|
|
Yin Jianan, Hu Minghua, Peng Ying, et al. Optimized Method for Multi-Runway Spatio-Temporal Resource Scheduling in Mode of Dependent Approaches [J]. Acta Aeronautica Et Astronautica Sinica, 2014, 35(11): 3064-3073.
|
2 |
樊玮, 吴建波, 衡红军. 基于多Agent的机场地面服务车辆调度方法研究[J]. 计算机应用与软件, 2015, 32(10): 256-259, 272.
|
|
Fan Wei, Wu Jianbo, Heng Hongjun. Research on Multi-Agent Based Dispatching Method for Airport Ground Service Vehicles [J]. Computer Applications and Software, 2015, 32(10): 256-259, 272.
|
3 |
何丹妮. 大型机场航班过站地面服务车辆调度问题研究[D]. 北京: 北京交通大学, 2018.
|
|
He Danni. Research on Scheduling of Ground Service Vehicles for Large Airport Airside Transition-Illustrated by the Case of Ferry Bus [D]. Beijing: Beijing Jiaotong University, 2018.
|
4 |
Hunsberger L. Algorithms for a Temporal Decoupling Problem in Multi-Agent Planning[C]//Eighteenth National Conference on Artificial Intelligence(AAAI-2002). American Association for Artificial Intelligence, 2002: 468-475.
|
5 |
王青召. 面向繁忙机场多场景的停机位分配优化研究[D]. 天津: 中国民航大学, 2018.
|
|
Wang Qingzhao. Research on Optimization of Multi-Scenario Gate Assignment in Busy Airports[D]. Tianjin: Civil Aviation University of China, 2018.
|
6 |
陈烨. 基于容量动态评估的机场地服保障车辆排班优化与应用[D]. 哈尔滨: 哈尔滨工业大学, 2020.
|
|
Chen Ye. Scheduling Optimization and Application of Ground Service Support'S Vehicles in Airport Based on Capacity Dynamic Evalution[D]. Harbin: Harbin Institute of Technology, 2020.
|
7 |
许晨晨, 邵荃. 不确定作业时间下机场地面服务保障设备调度优化[J]. 科学技术与工程, 2018, 18(3): 372-378.
|
|
Xu Chenchen, Shao Quan. Optimization of Airport Ground Service Support Equipment Scheduling under Uncertain Operation Time[J]. Science Technology and Engineering, 2012, 18(3): 372-378.
|
8 |
Du J Y, Brunner J O, Kolisch R. Planning Towing Processes at Airports More Efficiently[J]. Transportation Research Part E: Logistics and Transportation Review(S1366-5545), 2014, 70: 293-304.
|
9 |
何光勤, 罗凤娥, 马志刚. 签派程序与方法[M]. 成都: 西南交通大学出版社, 2004: 17-25.
|
|
He Guangqin, Luo Fenge, Ma Zhigang. Dispatch Procedure and Method[M]. Chengdu: Southwest Jiaotong University Press, 2004: 17-25.
|
10 |
陶婧婧. 机坪保障服务设备调度仿真与优化[D]. 南京: 南京航空航天大学, 2011.
|
|
Tao Jingjing. Simulation and Optimization of Ground Service Equipment Scheduling at Airport[D]. Nanjing: Nanjing University of Aeronautics and Astronautics, 2011.
|
11 |
Padrón S, Guimarans D, Ramos J J, et al. A Bi-Objective Approach for Scheduling Ground-Handling Vehicles in Airports[J]. Computers & Operations Research (S0305-0548), 2016, 71: 34-53.
|
12 |
邢志伟, 唐云霄. 枢纽机场航班保障服务时间估计[J]. 系统仿真学报, 2017, 29(11): 2856-2864.
|
|
Xing Zhiwei, Tang Yunxiao. Flight Support Service Time Estimation of Hub Airport[J]. Journal of System Simulation, 2017, 29(11): 2856-2864.
|
13 |
王秦辉, 陈恩红, 王煦法. 分布式约束满足问题研究及其进展[J]. 软件学报, 2006, 17(10): 2029-2039.
|
|
Wang Qinhui, Chen Enhong, Wang Xufa. Research and Development of Distributed Constraint Satisfaction Problems[J]. Journal of Software, 2006, 17(10): 2029-2039.
|
14 |
张华, 刘强. 多任务时间规划冲突检测方法[J]. 指挥控制与仿真, 2014, 36(2): 123-126.
|
|
Zhang Hua, Liu Qiang. Conflict Detection Method for Time Planning of Multiple Combat Missions[J]. Command Control & Simulation, 2014, 36(2): 123-126.
|
15 |
郑洁, 高剑明. 机场地面作业调度问题研究[J]. 河北北方学院学报(自然科学版), 2008, 24(6): 60-62.
|
|
Zheng Jie, Gao Jianming. Research on Problem of Airport Ground Services Scheduling[J]. Journal of Hebei North University (Natural Science Edition), 2008, 24(6): 60-62.
|
16 |
富月, 李婧怡. 线性多变量系统有限时间最优解耦控制[J]. 控制与决策, 2016, 31(12): 2271-2274.
|
|
Fu Yue, Li Jingyi. Finite-time Optimal Decoupling Control for Linear Multi-Variable Systems[J]. Control and Decision, 2016, 31(12): 2271-2274.
|
17 |
李远, 彭辉, 沈林成. 协同任务规划中基于约束满足的资源冲突检测与消解[J]. 系统工程与电子技术, 2009, 31(4): 868-873.
|
|
Li Yuan, Peng Hui, Shen Lincheng. Constraint Satisfaction Based Resource Conflicts Detection and Resolution in Collaborative Mission Planning[J]. Systems Engineering and Electronics, 2009, 31(4): 868-873.
|