[1] Steuben J C, Iliopoulos A P, Michopoulos J G.Discrete element modeling of particle-based additive manufacturing processes[J]. Computer Methods in Applied Mechanics and Engineering (S0045-7825), 2016, 305(15): 537-561. [2] 王艳, 纪志成. 机床产品制造系统能效的最优控制[J]. 控制理论与应用, 2014, 31(10): 1431-1440. (Wang Yan, Ji Zhicheng.Optimal control of energy efficiency for machine tool manufacturing systems[J]. Control Theory & Applications (S1000-8152), 2014, 31(10): 1431-1440.) [3] 方水良, 姚嫣菲, 赵诗奎. 柔性车间调度的改进遗传算法[J]. 浙江大学学报(工学版), 2012, 46(4): 629-635. (Fang Shuiliang, Yao Yanfei, Zhao Shikui.Improved genetic algorithm for flexible job shop scheduling[J]. Journal of Zhejiang University (Engineering Science)(S1008-973X), 2012, 46(4): 629-635.) [4] Mahdavi A, Shiri M E.An augmented Lagrangian ant colony based method for constrained optimization[J]. Computational Optimization & Applications (S0926-6003), 2015, 60(1): 263-276. [5] Karthikeyan S, Asokan P, Nickolas S.A hybrid discrete firefly algorithm for multi-objective flexible job shop scheduling problem with limited resource constraints[J]. The International Journal of Advanced Manufacturing Technology (S0268-3768), 2014, 72(9/12): 1567-1579. [6] 彭建刚, 刘明周. 基于改进非支配排序的云模型进化多目标柔性作业车间调度[J]. 机械工程学报, 2014, 50(12): 198-205. (Peng Jiangang, Liu Mingzhou.Cloud Model Evolutionary Multi-objective Flexible Job-shop Scheduling Based on Improved Non-dominated Sorting[J]. Journal of Mechanical Engineering (S057-7-6686), 2014, 50(12): 198-205.) [7] 李耀华, 王磊. 基于改进遗传算法的飞机排班优化方法研究[J]. 系统仿真学报, 2016, 28(3): 620-626. (Li Yanhua, Wang Lei.Study on Aircraft Scheduling Optimization Based on Improved Genetic Algorithm[J]. Journal of System Simulation (S1004-731X), 2016, 28(3): 620-626.) [8] 田娜, 纪志成. 改进量子粒子群求解多目标柔性作业车间调度[J]. 系统仿真学报, 2015, 27(12): 2948-2957. (Tian Na, Ji Zhicheng.Improved Quantum-behaved Particle Swarm Optimization for Solving Multi-objection Flexible Job-Shop Scheduling Problems[J]. Journal of System Simulation (S1004-731X), 2015, 27(12): 2948-2957.) [9] Thammano A, Phuang A.A Hybrid Artificial Bee Colony Algorithm with Local Search for Flexible Job-Shop Scheduling Problem[J]. Procedia Computer Science (S1877-0509), 2013, 20(10): 96-101. [10] Mora A M, García-Sánchez P, Merelo J J, et al.Pareto-based multi-colony multi-objective ant colony optimization algorithms: an island model proposal[J]. Soft Computing (S1432-7643), 2013, 17(7): 1175-1207. [11] Fang K, Uhan N, Zhao F, et al.A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction[J]. Journal of Manufacturing Systems (S0278-6125), 2011, 30(4): 234-240. [12] Rao R V, Savsani V J, Vakharia D P.Teaching- learning-based optimization: A novel method for constrained mechanical design optimization problems[J]. Computer-Aided Design (S0010-4485), 2011, 43(3): 303-315. [13] Rao R V, Savsani V J, Vakharia D P.Teaching-Learning- Based Optimization: An optimization method for continuo-us non-linear large scale problems[J]. Information Sciences (S0020-0255), 2012, 183(1): 1-15. [14] Rao R V, Patel V.An elitist teaching-learning based optimization algorithm for solving complex constrained optimization problems[J]. International Journal of Industrial Engineering Computations (S2251-712X), 2012, 3(4): 710-720. [15] Li J Q, Pan Q K, Mao K.A discrete teaching- learning-based optimisation algorithm for realistic flowshop rescheduling problems[J]. Engineering Applications of Artificial Intelligence (S0952-1976), 2015, 37(10): 279-292. |