[1] 王家善. 设施规划与设计[J]. 工业工程, 1998, 1(1): 11-14. (Wang J S.Facilities planning and design[J]. Industrial Engineering Journal, 1998, 1(1): 11-14.) [2] 朱荣钱, 杨季英, 李继禹. 应用成组技术原理改造机群式车间平面布置一例[J]. 机械工厂设计, 1990, 10(3): 31-34. (Zhu R Q, Yang J Y, Li J Y.A Case study of cluster layout of workshop based on group technology[J]. Design of Machinery Factory, 1990, 10(3): 31-34.) [3] Azadivar F, Wang J.Facility layout optimization using simulation and genetic algorithms[J]. International Journal of Production Research (S0975-2366), 2000, 38(17): 4369-4383. [4] Zhang Z F, Xiao R B.Empirical. Study on entropy models of cellular manufacturing systems[J]. Progress in Natural Science (S1745-5391), 2009, 19(3): 389-395. [5] Wu X D, Chu C H, Yan W L, et al.A genetic algorithm for cellular manufacturing design and layout[J]. European Journal of Operational Research (S0377-2217), 2007, 181(1): 156-167. [6] 张毕西, 周艳, 刘鑫. 离散生产系统车间设施布置优化[J]. 工业工程, 2004, 7(2): 8-11. (Zhang B X, Zhou Y, Liu X.Optimization of facility layout of workshop for discrete production systems[J]. Industrial Engineering Journal, 2004, 7(2): 8-11.) [7] 马玉敏. 单元化制造系统的构建及评价 [D]. 上海: 同济大学, 2002. (Ma Y M.Construction and evaluation of cellular manufacturing system [D]. Shanghai, China: Tongji University, 2002.) [8] 薛天然. 基于单元化制造的设备布局及仿真研究 [D]. 南京: 东南大学, 2007. (Xue T R.Research of facilities layout and simulation based on cellular manufacturing [D]. Nanjing, China: Southeast University, 2007.) [9] 俞爱林, 黎近秋, 毛宁, 等. 模具生产车间情景仿真[J]. 工业工程, 2012,15(3):115-121. (Yu A L, Li J Q, Mao N.Modeling for Scenario-Simulation in a Mold Production Workshop[J]. Industrial Engineering Journal, 2012, 15(3):115-121.) [10] Sergey D, Bushuyev, Sergey V, et al.Entropy measurement as a project control tool[J]. International Journal of Project Management (S1753-84326), 1999, 17(6): 343-350. [11] 张志峰, 谢奉军, 肖人彬. 基于状态熵模型的单元制造系统复杂性研究[J]. 中国机械工程, 2009, 20(19): 2332-2336. (Zhang Z F, Xie F J, Xiao R B.Study on complexity of cellular manufacturing based on state entropy models[J]. China Mechanical Engineering, 2009, 20(19): 2332-2336.) [12] 张志峰, 肖人彬. 基于熵模型的生产物流系统运行评价[J]. 计算机集成制造系统, 2010, 16(4): 810-816. (Zhang Z F, Xiao R B.Operation evaluation of production logistics system based on entropy model[J]. Computer Integrated Manufacturing Systems, 2010, 16(4): 810-816.) [13] 郭栋, 王晓原, 张晓琳, 等. 基于信号配时优化的路网运行效益仿真评价[J]. 系统仿真学报, 2013, 25(6): 1405-1409, 1414. (Guo D, Wang X Y, Zhang X L, et al.Evaluation of traffic operation benefit from signal timing optimization of dynamic traffic network[J]. Journal of System Simulation (S1004-731X), 2013, 25(6): 1405-1409, 1414.) [14] 成卫, 张东明, 肖海承. 路网可靠性动态交通仿真及评价系统研究[J]. 系统仿真学报, 2013, 25(12): 2986-2992. (Chen W, Zhang D M, Xiao H C.Research on dynamic traffic simulation and evaluation system of road network reliability[J]. Journal of System Simulation (S1004-731X), 2013, 25(12): 2986-2992.) [15] 陈绍宽, 詹琳霞, 吴海俊, 等. 基于DEA/AHP的快速路出入口间距仿真评价方法研究[J]. 系统仿真学报, 2010, 22(5): 1313-1318. (Chen S K, Zhan L X, Wu H J, et al.Evaluating intervals between on-and off-ramp through simulation based on DEA & AHP[J]. Journal of System Simulation (S1004-731X), 2010, 22(5): 1313-1318.) [16] 谢守俊, 周春辉, 黄立文, 等. 船闸扩容仿真评价系统[J]. 系统仿真学报, 2014, 26(8): 1863-1868. (Xie S J, Zhou C H, Huang L W, et al.Simulation and evaluation system for lock capacity expansion[J]. Journal of System Simulation (S1004-731X), 2014, 26(8): 1863-1868.) [17] 黎文瑞, 陈庆新, 毛宁, 等. 随机生产环境下的模具制造单元资源配置[J]. 计算机集成制造系统, 2001, 13(1): 2189-2194. (Li W R, Chen Q X, Mao N, et al.Resource allocation of mould manufacturing cell in environment of stochastic production[J]. Computer Integrated Manufacturing Systems, 2001, 13(1): 2189-2194.) [18] 俞爱林, 陈庆新, 毛宁. 基于典型零件的模具企业中长期设备资源规划建模[J]. 模具工业, 2009, 35(8): 1-5. (Yu A L, Chen Q X, Mao N.Modeling of long_term facility resource planning based on typical components for die and mould enterprises[J]. Die & Mould Industry, 2009, 35(8): 1-5.) |